Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1999 |
Principal Product | Hard and Soft Wood Lumber |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $1,000,000-$5,000,000 |
# of Employees | 18 |
Plant Area (Sq.Ft.) | 535,603 |
Annual Production | 5,000 Thousand Feet |
Production Hrs. Annual | 2,210 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,509 | 516,413 | kWh | $0.05 |
Electricity Demand | $24,264 | 3,244 | kW-months/year | $7.48 |
Electricity Fees | $9,828 | - | $ | - |
Fuel Oil #2 | $25,675 | 5,513 | MMBtu | $4.66 |
TOTAL ENERGY COSTS | $123,836 | |||
RECOMMENDED SAVINGS* | $88,497 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,707 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $69,817 Cost: $255,600 |
$26,059 | 332,943 | $1,655 | 456 | $25,675 | 5,513 | $16,428 | 5,476,000 |
$26,059 332,943 kWh |
$1,655 456 kW-months/year |
$25,675 5,513 MMBtu |
$16,428 5,476,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,001 Cost: $12,150 |
$5,001 | 63,892 | - | - | - | - | - | - |
$5,001 63,892 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,594 Cost: $24,400 |
$3,064 | 37,808 | $530 | 146 | - | - | - | - |
$3,064 37,808 kWh |
$530 146 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,481 Cost: $24,400 |
$4,679 | 57,737 | $802 | 221 | - | - | - | - |
$4,679 57,737 kWh |
$802 221 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,304 Cost: $6,042 |
$2,304 | 28,429 | - | - | - | - | - | - |
$2,304 28,429 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,706 Cost: $2,000 |
- | - | - | - | $1,706 | 385 | - | - |
- - kWh |
- - kW-months/year |
$1,706 385 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $594 Cost: - |
$594 | 7,327 | - | - | - | - | - | - |
$594 7,327 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $88,497 Cost: $324,592 |
$41,701 | 528,136 | $2,987 | 823 | $27,381 | 5,898 | $16,428 | 5,476,000 | $41,701 528,136 kWh |
$2,987 823 kW-months/year |
$27,381 5,898 MMBtu |
$16,428 5,476,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,707 Cost: $14,150 |
$5,001 | 63,892 | - | - | $1,706 | 385 | - | - | $5,001 63,892 kWh |
- - kW-months/year |
$1,706 385 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) |