IAC logo
IAC Assessment: MA0455
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0455
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product High performance Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,656
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $437,569 6,972,743 kWh $0.06
Electricity Demand $50,791 17,947 kW-months/year $2.83
Electricity Fees $2,837 - $ -
Natural Gas $119,468 25,173 MMBtu $4.75
TOTAL ENERGY COSTS $610,665
RECOMMENDED SAVINGS* $171,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$93,496
Cost:
$240,000
$112,979 1,847,890 $12,327 4,356 $(-31,810) (-9,063) $112,979
1,847,890
kWh
$12,327
4,356
kW-months/year
$(-31,810)
(-9,063)
MMBtu
02: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$33,134
Cost:
$16,250
- - $33,134 1,849 - - -
-
kWh
$33,134
1,849
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$24,310
Cost:
$50,000
- - - - $24,310 6,930 -
-
kWh
-
-
kW-months/year
$24,310
6,930
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,701
Cost:
$16,000
$16,701 273,154 - - - - $16,701
273,154
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,122
Cost:
$8,000
$4,122 67,409 - - - - $4,122
67,409
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$171,763
Cost:
$330,250
$133,802 2,188,453 $45,461 6,205 $(-7,500) (-2,133) $133,802
2,188,453
kWh
$45,461
6,205
kW-months/year
$(-7,500)
(-2,133)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas