IAC Assessment: MA0456
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0456
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Paper
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 185,000
Annual Production 11,500 Tons
Production Hrs. Annual 7,200
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $823,924 12,449,883 kWh $0.07
Electricity Demand $204,379 32,093 kW-months/year $6.37
Natural Gas $323,752 110,085 MMBtu $2.94
Fuel Oil #6 $142,500 45,600 MMBtu $3.13
TOTAL ENERGY COSTS $1,694,555
RECOMMENDED SAVINGS* $507,499 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,191
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ $ $ $
01: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$298,233
Cost:
$84,000
$(-6,925) (-107,268) $(-1,117) (-179) $6,275 1,634 - - - - - - $300,000 - - - $(-6,925)
(-107,268)
kWh
$(-1,117)
(-179)
kW-months/year
$6,275
1,634
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
$300,000
-
$
-
-
$
02: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$127,075
Cost:
$218,000
$124,619 1,930,246 $20,067 3,216 $(-13,436) (-3,449) $(-4,175) (-1,334) - - - - - - - - $124,619
1,930,246
kWh
$20,067
3,216
kW-months/year
$(-13,436)
(-3,449)
MMBtu
$(-4,175)
(-1,334)
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$37,815
Cost:
$84,000
$(-6,925) (-107,268) $(-1,117) (-179) $35,866 9,340 $9,991 3,192 - - - - - - - - $(-6,925)
(-107,268)
kWh
$(-1,117)
(-179)
kW-months/year
$35,866
9,340
MMBtu
$9,991
3,192
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$12,426
Cost:
-
- - - - $14,826 3,861 - - - - $(-2,400) - - - - - -
-
kWh
-
-
kW-months/year
$14,826
3,861
MMBtu
-
-
MMBtu
-
-
Tgal
$(-2,400)
-
$
-
-
$
-
-
$
05: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$10,122
Cost:
$16,000
$10,122 156,800 - - - - - - - - - - - - - - $10,122
156,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$8,467
Cost:
$8,625
$4,978 77,081 - - - - - - $3,489 4,209,564 - - - - - - $4,978
77,081
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,489
4,209,564
Tgal
-
-
$
-
-
$
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,929
Cost:
$250
- - - - $3,570 930 $1,109 354 - - - - - - $(-750) - -
-
kWh
-
-
kW-months/year
$3,570
930
MMBtu
$1,109
354
MMBtu
-
-
Tgal
-
-
$
-
-
$
$(-750)
-
$
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,240
Cost:
$5,500
- - - - - - - - $3,240 3,889,600 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,240
3,889,600
Tgal
-
-
$
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,914
Cost:
$4,925
$1,646 25,498 $268 43 - - - - - - - - - - - - $1,646
25,498
kWh
$268
43
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,646
Cost:
$4,225
$1,646 25,498 - - - - - - - - - - - - - - $1,646
25,498
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,457
Cost:
$4,925
$1,457 22,567 - - - - - - - - - - - - - - $1,457
22,567
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,175
Cost:
$3,400
$832 12,896 $343 55 - - - - - - - - - - - - $832
12,896
kWh
$343
55
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$507,499
Cost:
$433,850
$131,450 2,036,050 $18,444 2,956 $47,101 12,316 $6,925 2,212 $6,729 8,099,164 $(-2,400) - $300,000 - $(-750) - $131,450
2,036,050
kWh
$18,444
2,956
kW-months/year
$47,101
12,316
MMBtu
$6,925
2,212
MMBtu
$6,729
8,099,164
Tgal
$(-2,400)
-
$
$300,000
-
$
$(-750)
-
$
TOTAL IMPLEMENTED Savings:
$82,191
Cost:
$131,850
$13,756 213,072 $(-506) (-81) $54,262 14,131 $11,100 3,546 $6,729 8,099,164 $(-2,400) - - - $(-750) - $13,756
213,072
kWh
$(-506)
(-81)
kW-months/year
$54,262
14,131
MMBtu
$11,100
3,546
MMBtu
$6,729
8,099,164
Tgal
$(-2,400)
-
$
-
-
$
$(-750)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Primary Product By-product Production