IAC logo
IAC Assessment: MA0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Yogurt and Cultured Milk Products
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 77,000
Annual Production 88,400,000 Pieces
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $394,858 4,432,884 kWh $0.09
Electricity Demand $82,209 10,672 kW-months/year $7.70
Electricity Fees $8,137 - $ -
LPG $76,112 15,735 MMBtu $4.84
TOTAL ENERGY COSTS $617,272
RECOMMENDED SAVINGS* $13,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,766
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,269
Cost:
$64,000
$7,269 84,408 - - - - $7,269
84,408
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,885
Cost:
$6,215
$3,029 35,170 $582 75 $(-726) (-150) $3,029
35,170
kWh
$582
75
kW-months/year
$(-726)
(-150)
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,161
Cost:
$600
$1,161 13,482 - - - - $1,161
13,482
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$963
Cost:
$400
- - - - $963 199 -
-
kWh
-
-
kW-months/year
$963
199
MMBtu
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$757
Cost:
$1,000
$757 8,792 - - - - $757
8,792
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,035
Cost:
$72,215
$12,216 141,852 $582 75 $237 49 $12,216
141,852
kWh
$582
75
kW-months/year
$237
49
MMBtu
TOTAL IMPLEMENTED Savings:
$5,766
Cost:
$8,215
$4,947 57,444 $582 75 $237 49 $4,947
57,444
kWh
$582
75
kW-months/year
$237
49
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG