IAC Assessment: MA0465
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0465
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Corrugated Cardboard
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 68
Plant Area (Sq.Ft.) 140,300
Annual Production 1,500,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,940 4,633,060 kWh $0.06
Electricity Demand $59,605 13,304 kW-months/year $4.48
Electricity Fees $10,101 - $ -
Natural Gas $273,089 68,544 MMBtu $3.98
TOTAL ENERGY COSTS $648,735
RECOMMENDED SAVINGS* $42,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,526
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$34,550
Cost:
$50,000
- - - - - - $39,000 130,000 $550 - $(-5,000) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$39,000
130,000
Tgal
$550
-
Tgal
$(-5,000)
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,076
Cost:
$4,125
- - $4,076 664 - - - - - - - - -
-
kWh
$4,076
664
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,682
Cost:
$20,325
$2,682 53,048 - - - - - - - - - - $2,682
53,048
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$845
Cost:
$528
$845 16,706 - - - - - - - - - - $845
16,706
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$605
Cost:
$400
- - - - $605 180 - - - - - - -
-
kWh
-
-
kW-months/year
$605
180
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$42,758
Cost:
$75,378
$3,527 69,754 $4,076 664 $605 180 $39,000 130,000 $550 - $(-5,000) - $3,527
69,754
kWh
$4,076
664
kW-months/year
$605
180
MMBtu
$39,000
130,000
Tgal
$550
-
Tgal
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$5,526
Cost:
$5,053
$845 16,706 $4,076 664 $605 180 - - - - - - $845
16,706
kWh
$4,076
664
kW-months/year
$605
180
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption By-product Production