Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | Corrugated Cardboard |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $50,000,000-$100,000,000 |
# of Employees | 68 |
Plant Area (Sq.Ft.) | 140,300 |
Annual Production | 1,500,000 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $266,940 | 4,633,060 | kWh | $0.06 |
Electricity Demand | $59,605 | 13,304 | kW-months/year | $4.48 |
Electricity Fees | $10,101 | - | $ | - |
Natural Gas | $273,089 | 68,544 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $648,735 | |||
RECOMMENDED SAVINGS* | $42,758 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,526 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $34,550 Cost: $50,000 |
- | - | - | - | - | - | $39,000 | 130,000 | $550 | - | $(-5,000) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$39,000 130,000 Tgal |
$550 - Tgal |
$(-5,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $4,076 Cost: $4,125 |
- | - | $4,076 | 664 | - | - | - | - | - | - | - | - |
- - kWh |
$4,076 664 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,682 Cost: $20,325 |
$2,682 | 53,048 | - | - | - | - | - | - | - | - | - | - |
$2,682 53,048 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $845 Cost: $528 |
$845 | 16,706 | - | - | - | - | - | - | - | - | - | - |
$845 16,706 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $605 Cost: $400 |
- | - | - | - | $605 | 180 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$605 180 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,758 Cost: $75,378 |
$3,527 | 69,754 | $4,076 | 664 | $605 | 180 | $39,000 | 130,000 | $550 | - | $(-5,000) | - | $3,527 69,754 kWh |
$4,076 664 kW-months/year |
$605 180 MMBtu |
$39,000 130,000 Tgal |
$550 - Tgal |
$(-5,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,526 Cost: $5,053 |
$845 | 16,706 | $4,076 | 664 | $605 | 180 | - | - | - | - | - | - | $845 16,706 kWh |
$4,076 664 kW-months/year |
$605 180 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | By-product Production |