Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | Soy Foods |
NAICS | n/a |
SIC | 2032 - Canned Specialties |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 57,500 |
Annual Production | 2,600,000 Pounds |
Production Hrs. Annual | 5,070 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $131,096 | 2,698,417 | kWh | $0.05 |
Electricity Demand | $84,074 | 6,954 | kW-months/year | $12.09 |
Electricity Fees | $25,235 | - | $ | - |
Natural Gas | $140,845 | 26,669 | MMBtu | $5.28 |
TOTAL ENERGY COSTS | $512,166 | |||
RECOMMENDED SAVINGS* | $46,474 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,224 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | By-product Production | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION |
Savings: $28,530 Cost: $100,000 |
- | - | - | - | - | - | - | - | $36,530 | 59,230 | - | - | $(-8,000) | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - gal |
$36,530 59,230 lb |
- - lb |
$(-8,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $17,250 Cost: $47,030 |
- | - | $12,421 | 1,795 | $(-746) | (-73,474) | $174 | 115,715 | - | - | $5,401 | 18,003 | - | - |
- - kWh |
$12,421 1,795 MMBtu |
$(-746) (-73,474) Tgal |
$174 115,715 gal |
- - lb |
$5,401 18,003 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $390 Cost: $440 |
$390 | 11,137 | - | - | - | - | - | - | - | - | - | - | - | - |
$390 11,137 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $304 Cost: $474 |
$304 | 7,913 | - | - | - | - | - | - | - | - | - | - | - | - |
$304 7,913 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,474 Cost: $147,944 |
$694 | 19,050 | $12,421 | 1,795 | $(-746) | (-73,474) | $174 | 115,715 | $36,530 | 59,230 | $5,401 | 18,003 | $(-8,000) | - | $694 19,050 kWh |
$12,421 1,795 MMBtu |
$(-746) (-73,474) Tgal |
$174 115,715 gal |
$36,530 59,230 lb |
$5,401 18,003 lb |
$(-8,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,224 Cost: $100,914 |
$694 | 19,050 | - | - | - | - | - | - | $36,530 | 59,230 | - | - | $(-8,000) | - | $694 19,050 kWh |
- - MMBtu |
- - Tgal |
- - gal |
$36,530 59,230 lb |
- - lb |
$(-8,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | By-product Production | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | By-product Production |