Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | Braiding Machines |
NAICS | n/a |
SIC | 3552 - Textile Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 500 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | RI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,272 | 1,508,206 | kWh | $0.07 |
Electricity Demand | $7,929 | 4,887 | kW-months/year | $1.62 |
Electricity Fees | $8,915 | - | $ | - |
Natural Gas | $32,761 | 5,394 | MMBtu | $6.07 |
TOTAL ENERGY COSTS | $151,404 | |||
RECOMMENDED SAVINGS* | $12,243 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,155 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,392 Cost: $17,000 |
$3,392 | 43,962 | - | - | - | - | - | - |
$3,392 43,962 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,357 Cost: - |
$1,357 | 17,585 | - | - | - | - | - | - |
$1,357 17,585 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,374 Cost: $1,010 |
$2,374 | 30,774 | - | - | - | - | - | - |
$2,374 30,774 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $3,400 Cost: $12,780 |
$3,400 | 43,962 | - | - | - | - | - | - |
$3,400 43,962 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $696 Cost: $1,495 |
$995 | 12,896 | $79 | 60 | $(-378) | (-55) | - | - |
$995 12,896 kWh |
$79 60 kW-months/year |
$(-378) (-55) MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8214 USE WATER-BASED DEVELOPERS AND FINISHERS |
Savings: $527 Cost: $960 |
- | - | - | - | - | - | $527 | 185 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$527 185 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $497 Cost: $750 |
$497 | 6,448 | - | - | - | - | - | - |
$497 6,448 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,243 Cost: $33,995 |
$12,015 | 155,627 | $79 | 60 | $(-378) | (-55) | $527 | 185 | $12,015 155,627 kWh |
$79 60 kW-months/year |
$(-378) (-55) MMBtu |
$527 185 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,155 Cost: $15,500 |
$7,628 | 98,769 | - | - | - | - | $527 | 185 | $7,628 98,769 kWh |
- - kW-months/year |
- - MMBtu |
$527 185 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) |