Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | Rubber belting |
NAICS | n/a |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 172 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 6,420 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $318,052 | 8,160,024 | kWh | $0.04 |
Electricity Demand | $255,923 | 23,038 | kW-months/year | $11.11 |
Electricity Fees | $21,927 | - | $ | - |
Natural Gas | $426,474 | 92,552 | MMBtu | $4.61 |
Fuel Oil #4 | $33,716 | 6,153 | MMBtu | $5.48 |
TOTAL ENERGY COSTS | $1,056,092 | |||
RECOMMENDED SAVINGS* | $33,465 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,752 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $9,400 Cost: - |
$9,400 | 239,156 | - | - | - | - |
$9,400 239,156 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,991 Cost: $10,000 |
$5,845 | 114,596 | $3,146 | 220 | - | - |
$5,845 114,596 kWh |
$3,146 220 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,166 Cost: $2,000 |
$4,166 | 86,460 | - | - | - | - |
$4,166 86,460 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,713 Cost: $9,000 |
$448 | 8,792 | $3,432 | 240 | $(-167) | (-37) |
$448 8,792 kWh |
$3,432 240 kW-months/year |
$(-167) (-37) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $2,589 Cost: $2,000 |
$1,141 | 26,964 | - | - | $1,448 | 321 |
$1,141 26,964 kWh |
- - kW-months/year |
$1,448 321 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,347 Cost: $315 |
$2,347 | 46,014 | - | - | - | - |
$2,347 46,014 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,195 Cost: $3,000 |
- | - | - | - | $1,195 | 265 |
- - kWh |
- - kW-months/year |
$1,195 265 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,064 Cost: $3,000 |
- | - | - | - | $1,064 | 236 |
- - kWh |
- - kW-months/year |
$1,064 236 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,465 Cost: $29,315 |
$23,347 | 521,982 | $6,578 | 460 | $3,540 | 785 | $23,347 521,982 kWh |
$6,578 460 kW-months/year |
$3,540 785 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,752 Cost: $20,315 |
$22,899 | 513,190 | $3,146 | 220 | $3,707 | 822 | $22,899 513,190 kWh |
$3,146 220 kW-months/year |
$3,707 822 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |