IAC Assessment: MA0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Injection Molding Plastic Products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 142
Plant Area (Sq.Ft.) 78,468
Annual Production 2,700 Tons
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,226 5,665,229 kWh $0.04
Electricity Demand $131,789 10,868 kW-months/year $12.13
Electricity Fees $4,437 - $ -
LPG $755 69 MMBtu $10.94
Fuel Oil #1 $6,279 1,357 MMBtu $4.63
Fuel Oil #2 $8,787 1,901 MMBtu $4.62
TOTAL ENERGY COSTS $393,273
RECOMMENDED SAVINGS* $76,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,242
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$28,890
Cost:
$140,000
$22,578 459,555 $6,312 3,145 - - $22,578
459,555
kWh
$6,312
3,145
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,924
Cost:
$129,000
$15,718 313,013 $9,206 756 - - $15,718
313,013
kWh
$9,206
756
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,760
Cost:
$1,200
$5,760 117,233 - - - - $5,760
117,233
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,180
Cost:
-
$5,180 89,097 - - - - $5,180
89,097
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,269
Cost:
$350
$3,269 66,530 - - - - $3,269
66,530
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,779
Cost:
$7,000
$2,779 56,565 - - - - $2,779
56,565
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,770
Cost:
$100
$2,060 41,911 $710 58 - - $2,060
41,911
kWh
$710
58
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,440
Cost:
$3,000
$1,440 29,308 - - - - $1,440
29,308
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$936
Cost:
$5,000
$821 16,706 $781 64 $(-666) (-71) $821
16,706
kWh
$781
64
kW-months/year
$(-666)
(-71)
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$650
Cost:
$1,250
$650 13,189 - - - - $650
13,189
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$76,598
Cost:
$286,900
$60,255 1,203,107 $17,009 4,023 $(-666) (-71) $60,255
1,203,107
kWh
$17,009
4,023
kW-months/year
$(-666)
(-71)
MMBtu
TOTAL IMPLEMENTED Savings:
$72,242
Cost:
$280,550
$56,724 1,131,301 $15,518 3,901 - - $56,724
1,131,301
kWh
$15,518
3,901
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG