IAC logo
IAC Assessment: MA0475
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0475
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Frozen Seafood
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 68,000
Annual Production 12,350 Tons
Production Hrs. Annual 3,250
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,224 3,274,619 kWh $0.06
Electricity Demand $62,438 11,220 kW-months/year $5.56
Natural Gas $48,258 12,186 MMBtu $3.96
TOTAL ENERGY COSTS $339,587
RECOMMENDED SAVINGS* $10,739 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,500
Cost:
$8,500
- - - - $2,500 628 - - -
-
kWh
-
-
kW-months/year
$2,500
628
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,450
Cost:
$5,700
- - $2,450 389 - - - - -
-
kWh
$2,450
389
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,000
Cost:
$2,400
- - - - $2,000 503 - - -
-
kWh
-
-
kW-months/year
$2,000
503
MMBtu
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,950
Cost:
-
$1,950 31,067 - - - - - - $1,950
31,067
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$970
Cost:
$150
$970 14,947 - - - - - - $970
14,947
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$519
Cost:
-
- - - - - - $519 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$519
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$220
Cost:
$500
$220 3,517 - - - - - - $220
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$130
Cost:
-
$130 2,052 - - - - - - $130
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,739
Cost:
$17,250
$3,270 51,583 $2,450 389 $4,500 1,131 $519 - $3,270
51,583
kWh
$2,450
389
kW-months/year
$4,500
1,131
MMBtu
$519
-
$
TOTAL IMPLEMENTED Savings:
$8,019
Cost:
$8,250
$3,050 48,066 $2,450 389 $2,000 503 $519 - $3,050
48,066
kWh
$2,450
389
kW-months/year
$2,000
503
MMBtu
$519
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production