IAC Assessment: MA0477
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0477
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Surgical Tape
NAICS n/a
SIC 2835 - Diagnostic Substances
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 81,000
Annual Production 0 Units
Production Hrs. Annual 2,032
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $588,126 10,644,197 kWh $0.06
Electricity Demand $256,967 20,015 kW-months/year $12.84
Electricity Fees $2,845 - $ -
Natural Gas $191,538 33,698 MMBtu $5.68
TOTAL ENERGY COSTS $1,097,957
RECOMMENDED SAVINGS* $58,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,610
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$22,890
Cost:
$2,000
$22,890 489,449 - - - - $22,890
489,449
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$21,290
Cost:
$103,000
$(-6,260) (-133,939) - - $27,550 5,875 $(-6,260)
(-133,939)
kWh
-
-
kW-months/year
$27,550
5,875
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$6,580
Cost:
$21,000
$3,320 79,132 $3,260 360 - - $3,320
79,132
kWh
$3,260
360
kW-months/year
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,910
Cost:
-
$570 13,189 $3,340 745 - - $570
13,189
kWh
$3,340
745
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,200
Cost:
$11,700
$3,200 67,409 - - - - $3,200
67,409
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$410
Cost:
$500
$410 7,620 - - - - $410
7,620
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$58,280
Cost:
$138,200
$24,130 522,860 $6,600 1,105 $27,550 5,875 $24,130
522,860
kWh
$6,600
1,105
kW-months/year
$27,550
5,875
MMBtu
TOTAL IMPLEMENTED Savings:
$3,610
Cost:
$12,200
$3,610 75,029 - - - - $3,610
75,029
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas