IAC Assessment: MA0479
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0479
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product Latches
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 70,000
Annual Production 9,603,500 Pieces
Production Hrs. Annual 4,680
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,248 1,311,841 kWh $0.07
Electricity Demand $47,803 3,445 kW-months/year $13.88
Electricity Fees $7,178 - $ -
Natural Gas $17,563 3,413 MMBtu $5.15
TOTAL ENERGY COSTS $198,364
RECOMMENDED SAVINGS* $20,270 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,190
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$7,300
Cost:
$3,000
- - - - $7,300 1,300 -
-
kWh
-
-
kW-months/year
$7,300
1,300
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,900
Cost:
$8,400
$6,900 108,441 - - - - $6,900
108,441
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,310
Cost:
$550
$2,310 36,342 - - - - $2,310
36,342
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,760
Cost:
$5,800
$2,550 39,566 $170 137 $(-960) (-170) $2,550
39,566
kWh
$170
137
kW-months/year
$(-960)
(-170)
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$930
Cost:
-
$930 14,654 - - - - $930
14,654
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$750
Cost:
$1,250
$750 12,016 - - - - $750
12,016
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$320
Cost:
$1,400
$390 6,155 $120 8 $(-190) (-34) $390
6,155
kWh
$120
8
kW-months/year
$(-190)
(-34)
MMBtu
TOTAL RECOMMENDED Savings:
$20,270
Cost:
$20,400
$13,830 217,174 $290 145 $6,150 1,096 $13,830
217,174
kWh
$290
145
kW-months/year
$6,150
1,096
MMBtu
TOTAL IMPLEMENTED Savings:
$18,190
Cost:
$13,200
$10,890 171,453 - - $7,300 1,300 $10,890
171,453
kWh
-
-
kW-months/year
$7,300
1,300
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas