Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2000 |
Principal Product | bearings |
NAICS | n/a |
SIC | 3562 - Ball And Roller Bearings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 379 |
Plant Area (Sq.Ft.) | 555,000 |
Annual Production | 1,930,500 Pieces |
Production Hrs. Annual | 7,020 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,229,145 | 24,974,209 | kWh | $0.05 |
Electricity Demand | $467,357 | 51,665 | kW-months/year | $9.05 |
Electricity Fees | $25,554 | - | $ | - |
Natural Gas | $248,068 | 55,497 | MMBtu | $4.47 |
Fuel Oil #6 | $186,876 | 56,990 | MMBtu | $3.28 |
TOTAL ENERGY COSTS | $2,157,000 | |||
RECOMMENDED SAVINGS* | $130,715 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,825 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $63,120 Cost: $282,000 |
$81,470 | 1,638,335 | $21,150 | 2,480 | $(-39,500) | (-6,990) | - | - | - | - |
$81,470 1,638,335 kWh |
$21,150 2,480 kW-months/year |
$(-39,500) (-6,990) MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,190 Cost: $10,000 |
$1,680 | 35,170 | - | - | - | - | $(-490) | (-150) | - | - |
$1,680 35,170 kWh |
- - kW-months/year |
- - MMBtu |
$(-490) (-150) MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $4,330 Cost: $8,000 |
$(-70) | (-1,465) | - | - | - | - | - | - | $4,400 | - |
$(-70) (-1,465) kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$4,400 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $10,600 Cost: $5,000 |
- | - | - | - | - | - | $10,600 | 3,230 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,600 3,230 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,290 Cost: $9,000 |
$1,290 | 26,964 | - | - | - | - | - | - | - | - |
$1,290 26,964 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,290 Cost: $6,500 |
$1,290 | 25,791 | - | - | - | - | - | - | - | - |
$1,290 25,791 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $21,450 Cost: $27,000 |
$21,450 | 448,417 | - | - | - | - | - | - | - | - |
$21,450 448,417 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $8,620 Cost: $2,000 |
$8,620 | 177,022 | - | - | - | - | - | - | - | - |
$8,620 177,022 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $930 Cost: - |
$930 | 19,050 | - | - | - | - | - | - | - | - |
$930 19,050 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,660 Cost: $5,000 |
$3,680 | 75,615 | $980 | 115 | - | - | - | - | - | - |
$3,680 75,615 kWh |
$980 115 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,020 Cost: - |
$1,020 | 20,516 | - | - | - | - | - | - | - | - |
$1,020 20,516 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $12,215 Cost: $1,000 |
$12,215 | 247,655 | - | - | - | - | - | - | - | - |
$12,215 247,655 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $130,715 Cost: $355,500 |
$133,575 | 2,713,070 | $22,130 | 2,595 | $(-39,500) | (-6,990) | $10,110 | 3,080 | $4,400 | - | $133,575 2,713,070 kWh |
$22,130 2,595 kW-months/year |
$(-39,500) (-6,990) MMBtu |
$10,110 3,080 MMBtu |
$4,400 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,825 Cost: $48,000 |
$47,845 | 986,810 | $980 | 115 | - | - | $10,600 | 3,230 | $4,400 | - | $47,845 986,810 kWh |
$980 115 kW-months/year |
- - MMBtu |
$10,600 3,230 MMBtu |
$4,400 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Consumption |