IAC logo
IAC Assessment: MA0480
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0480
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2000
Principal Product bearings
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 379
Plant Area (Sq.Ft.) 555,000
Annual Production 1,930,500 Pieces
Production Hrs. Annual 7,020
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,229,145 24,974,209 kWh $0.05
Electricity Demand $467,357 51,665 kW-months/year $9.05
Electricity Fees $25,554 - $ -
Natural Gas $248,068 55,497 MMBtu $4.47
Fuel Oil #6 $186,876 56,990 MMBtu $3.28
TOTAL ENERGY COSTS $2,157,000
RECOMMENDED SAVINGS* $130,715 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,825
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$63,120
Cost:
$282,000
$81,470 1,638,335 $21,150 2,480 $(-39,500) (-6,990) - - - - $81,470
1,638,335
kWh
$21,150
2,480
kW-months/year
$(-39,500)
(-6,990)
MMBtu
-
-
MMBtu
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,190
Cost:
$10,000
$1,680 35,170 - - - - $(-490) (-150) - - $1,680
35,170
kWh
-
-
kW-months/year
-
-
MMBtu
$(-490)
(-150)
MMBtu
-
-
Tgal
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$4,330
Cost:
$8,000
$(-70) (-1,465) - - - - - - $4,400 - $(-70)
(-1,465)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$4,400
-
Tgal
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$10,600
Cost:
$5,000
- - - - - - $10,600 3,230 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,600
3,230
MMBtu
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,290
Cost:
$9,000
$1,290 26,964 - - - - - - - - $1,290
26,964
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,290
Cost:
$6,500
$1,290 25,791 - - - - - - - - $1,290
25,791
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,450
Cost:
$27,000
$21,450 448,417 - - - - - - - - $21,450
448,417
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
08: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$8,620
Cost:
$2,000
$8,620 177,022 - - - - - - - - $8,620
177,022
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
09: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$930
Cost:
-
$930 19,050 - - - - - - - - $930
19,050
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,660
Cost:
$5,000
$3,680 75,615 $980 115 - - - - - - $3,680
75,615
kWh
$980
115
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,020
Cost:
-
$1,020 20,516 - - - - - - - - $1,020
20,516
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$12,215
Cost:
$1,000
$12,215 247,655 - - - - - - - - $12,215
247,655
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$130,715
Cost:
$355,500
$133,575 2,713,070 $22,130 2,595 $(-39,500) (-6,990) $10,110 3,080 $4,400 - $133,575
2,713,070
kWh
$22,130
2,595
kW-months/year
$(-39,500)
(-6,990)
MMBtu
$10,110
3,080
MMBtu
$4,400
-
Tgal
TOTAL IMPLEMENTED Savings:
$63,825
Cost:
$48,000
$47,845 986,810 $980 115 - - $10,600 3,230 $4,400 - $47,845
986,810
kWh
$980
115
kW-months/year
-
-
MMBtu
$10,600
3,230
MMBtu
$4,400
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Consumption