IAC logo
IAC Assessment: MA0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Fabricated metal products
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 106
Plant Area (Sq.Ft.) 52,000
Annual Production 535,000 Pieces
Production Hrs. Annual 5,300
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,735 914,120 kWh $0.07
Electricity Demand $31,924 3,646 kW-months/year $8.76
Natural Gas $26,214 2,766 MMBtu $9.48
TOTAL ENERGY COSTS $123,347
RECOMMENDED SAVINGS* $42,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,200
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 4.4520 ELIMINATE SHIFT Savings:
$19,200
Cost:
-
$14,200 168,200 $5,000 440 - - $14,200
168,200
kWh
$5,000
440
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$10,500
Cost:
$800
$1,600 19,600 $8,900 790 - - $1,600
19,600
kWh
$8,900
790
MMBtu
-
-
$
03: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$4,300
Cost:
$25,000
- - $4,300 380 - - -
-
kWh
$4,300
380
MMBtu
-
-
$
04: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$3,300
Cost:
-
- - - - $3,300 - -
-
kWh
-
-
MMBtu
$3,300
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,700
Cost:
$5,000
- - $1,700 120 - - -
-
kWh
$1,700
120
MMBtu
-
-
$
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,400
Cost:
$8,000
$1,400 16,200 - - - - $1,400
16,200
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$900
Cost:
$350
$900 10,400 - - - - $900
10,400
kWh
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$800
Cost:
$1,100
$800 9,100 - - - - $800
9,100
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$300
Cost:
$2,000
$300 3,500 - - - - $300
3,500
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$42,400
Cost:
$42,250
$19,200 227,000 $19,900 1,730 $3,300 - $19,200
227,000
kWh
$19,900
1,730
MMBtu
$3,300
-
$
TOTAL IMPLEMENTED Savings:
$17,200
Cost:
$7,250
$3,300 39,100 $10,600 910 $3,300 - $3,300
39,100
kWh
$10,600
910
MMBtu
$3,300
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product