Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2001 |
Principal Product | Fabricated metal products |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 106 |
Plant Area (Sq.Ft.) | 52,000 |
Annual Production | 535,000 Pieces |
Production Hrs. Annual | 5,300 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $64,735 | 914,120 | kWh | $0.07 |
Electricity Demand | $31,924 | 3,646 | kW-months/year | $8.76 |
Natural Gas | $26,214 | 2,766 | MMBtu | $9.48 |
TOTAL ENERGY COSTS | $123,347 | |||
RECOMMENDED SAVINGS* | $42,400 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,200 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.452 ELIMINATE SHIFT |
Savings: $19,200 Cost: - |
$14,200 | 168,200 | $5,000 | 440 | - | - |
$14,200 168,200 kWh |
$5,000 440 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $10,500 Cost: $800 |
$1,600 | 19,600 | $8,900 | 790 | - | - |
$1,600 19,600 kWh |
$8,900 790 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $4,300 Cost: $25,000 |
- | - | $4,300 | 380 | - | - |
- - kWh |
$4,300 380 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $3,300 Cost: - |
- | - | - | - | $3,300 | - |
- - kWh |
- - MMBtu |
$3,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,700 Cost: $5,000 |
- | - | $1,700 | 120 | - | - |
- - kWh |
$1,700 120 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $1,400 Cost: $8,000 |
$1,400 | 16,200 | - | - | - | - |
$1,400 16,200 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $900 Cost: $350 |
$900 | 10,400 | - | - | - | - |
$900 10,400 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $800 Cost: $1,100 |
$800 | 9,100 | - | - | - | - |
$800 9,100 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $300 Cost: $2,000 |
$300 | 3,500 | - | - | - | - |
$300 3,500 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,400 Cost: $42,250 |
$19,200 | 227,000 | $19,900 | 1,730 | $3,300 | - | $19,200 227,000 kWh |
$19,900 1,730 MMBtu |
$3,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,200 Cost: $7,250 |
$3,300 | 39,100 | $10,600 | 910 | $3,300 | - | $3,300 39,100 kWh |
$10,600 910 MMBtu |
$3,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product |