IAC Assessment: MA0488
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0488
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Paper
NAICS n/a
SIC 2621 - Paper Mills
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 200,000
Annual Production 40,000 Tons
Production Hrs. Annual 8,600
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,631,300 33,006,478 kWh $0.05
Electricity Demand $558,531 61,285 kW-months/year $9.11
Electricity Fees $49,571 - $ -
Fuel Oil #2 $157,800 19,991 MMBtu $7.89
Fuel Oil #6 $1,586,800 384,636 MMBtu $4.13
TOTAL ENERGY COSTS $3,984,002
RECOMMENDED SAVINGS* $420,825 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $135,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Fuel Oil #6 Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$241,800
Cost:
$250,000
$(-25,600) (-513,200) $(-6,600) (-720) $274,000 66,450 - - - - $(-25,600)
(-513,200)
kWh
$(-6,600)
(-720)
kW-months/year
$274,000
66,450
MMBtu
-
-
$
-
-
Tgal
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$84,500
Cost:
$1,500
- - - - $84,500 20,500 - - - - -
-
kWh
-
-
kW-months/year
$84,500
20,500
MMBtu
-
-
$
-
-
Tgal
03: 3.4151 MINIMIZE WATER USAGE Savings:
$25,000
Cost:
-
- - - - - - - - $25,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$25,000
-
Tgal
04: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$24,500
Cost:
$5,000
- - - - - - $(-13,500) - $38,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-13,500)
-
$
$38,000
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,500
Cost:
$20,000
$10,500 211,000 - - - - - - - - $10,500
211,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,025
Cost:
$700
$6,025 120,500 - - - - - - - - $6,025
120,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,800
Cost:
-
$5,800 116,000 - - - - - - - - $5,800
116,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,000
Cost:
$12,000
$5,000 99,000 - - - - - - - - $5,000
99,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,900
Cost:
$8,000
$4,900 97,400 - - - - - - - - $4,900
97,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,700
Cost:
$7,500
$3,700 74,000 - - - - - - - - $3,700
74,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,000
Cost:
$8,000
$3,000 60,500 - - - - - - - - $3,000
60,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,000
Cost:
$8,000
$3,000 62,500 - - - - - - - - $3,000
62,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
13: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,900
Cost:
$1,000
$2,900 57,700 - - - - - - - - $2,900
57,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
14: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$200
Cost:
$150
- - - - $200 48 - - - - -
-
kWh
-
-
kW-months/year
$200
48
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$420,825
Cost:
$321,850
$19,225 385,400 $(-6,600) (-720) $358,700 86,998 $(-13,500) - $63,000 - $19,225
385,400
kWh
$(-6,600)
(-720)
kW-months/year
$358,700
86,998
MMBtu
$(-13,500)
-
$
$63,000
-
Tgal
TOTAL IMPLEMENTED Savings:
$135,125
Cost:
$29,850
$25,425 506,900 - - $84,700 20,548 - - $25,000 - $25,425
506,900
kWh
-
-
kW-months/year
$84,700
20,548
MMBtu
-
-
$
$25,000
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Fuel Oil #6 Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Fuel Oil #6 Ancillary Material Cost Water Consumption