IAC logo
IAC Assessment: MA0490
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0490
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Structural fasteners
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 83,000
Annual Production 25,000 Tons
Production Hrs. Annual 8,400
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,382 5,820,400 kWh $0.04
Electricity Demand $165,105 10,985 kW-months/year $15.03
Electricity Fees $19,140 - $ -
Natural Gas $189,118 29,963 MMBtu $6.31
TOTAL ENERGY COSTS $619,366
RECOMMENDED SAVINGS* $23,198 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,848
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$7,248
Cost:
-
- - - - $7,248 874 - - -
-
kWh
-
-
kW-months/year
$7,248
874
MMBtu
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,500
Cost:
$14,500
- - - - $6,500 1,000 - - -
-
kWh
-
-
kW-months/year
$6,500
1,000
MMBtu
-
-
Tgal
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,500
Cost:
$390
$2,300 54,600 $1,200 78 - - - - $2,300
54,600
kWh
$1,200
78
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,350
Cost:
$5,000
$2,350 62,000 - - - - - - $2,350
62,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,500
Cost:
$6,000
- - - - - - $1,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,500
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,100
Cost:
$1,000
$1,100 26,500 - - - - - - $1,100
26,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,000
Cost:
-
- - - - $1,000 120 - - -
-
kWh
-
-
kW-months/year
$1,000
120
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$23,198
Cost:
$26,890
$5,750 143,100 $1,200 78 $14,748 1,994 $1,500 - $5,750
143,100
kWh
$1,200
78
kW-months/year
$14,748
1,994
MMBtu
$1,500
-
Tgal
TOTAL IMPLEMENTED Savings:
$12,848
Cost:
$1,390
$3,400 81,100 $1,200 78 $8,248 994 - - $3,400
81,100
kWh
$1,200
78
kW-months/year
$8,248
994
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption