Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2001 |
Principal Product | Easter White Pine Boards |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $5,000,000-$10,000,000 |
# of Employees | 18 |
Plant Area (Sq.Ft.) | 46,450 |
Annual Production | 5,000 Thousand Feet |
Production Hrs. Annual | 2,140 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $63,196 | 721,366 | kWh | $0.09 |
Electricity Demand | $8,912 | 4,959 | kW-months/year | $1.80 |
Electricity Fees | $2,889 | - | $ | - |
Fuel Oil #2 | $33,307 | 4,276 | MMBtu | $7.79 |
TOTAL ENERGY COSTS | $108,304 | |||
RECOMMENDED SAVINGS* | $27,547 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,209 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4311 RECOVER MECHANICAL ENERGY |
Savings: $9,000 Cost: $40,000 |
$4,000 | 51,252 | - | - | $5,000 | - |
$4,000 51,252 kWh |
- - MMBtu |
$5,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,447 Cost: $17,000 |
- | - | $6,447 | 1,071 | - | - |
- - kWh |
$6,447 1,071 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,736 Cost: $23,650 |
$4,736 | 60,713 | - | - | - | - |
$4,736 60,713 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $3,155 Cost: $50,000 |
- | - | $3,155 | 524 | - | - |
- - kWh |
$3,155 524 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,200 Cost: - |
$2,200 | 28,206 | - | - | - | - |
$2,200 28,206 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,090 Cost: $1,100 |
- | - | $1,090 | 181 | - | - |
- - kWh |
$1,090 181 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $846 Cost: $3,000 |
$846 | 10,840 | - | - | - | - |
$846 10,840 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $73 Cost: $400 |
$73 | 931 | - | - | - | - |
$73 931 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,547 Cost: $135,150 |
$11,855 | 151,942 | $10,692 | 1,776 | $5,000 | - | $11,855 151,942 kWh |
$10,692 1,776 MMBtu |
$5,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,209 Cost: $44,500 |
$7,119 | 91,229 | $1,090 | 181 | $5,000 | - | $7,119 91,229 kWh |
$1,090 181 MMBtu |
$5,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes |