IAC logo
IAC Assessment: MA0497
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0497
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Easter White Pine Boards
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 2,255,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 4,080
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $327,978 3,809,712 kWh $0.09
Electricity Demand $28,959 13,413 kW-months/year $2.16
Electricity Fees $7,574 - $ -
LPG $4,218 305 MMBtu $13.83
Fuel Oil #2 $192,204 29,956 MMBtu $6.42
TOTAL ENERGY COSTS $560,933
RECOMMENDED SAVINGS* $124,346 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,406
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Wood Other Energy Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #2 Wood Other Energy Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $ $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$38,169
Cost:
$79,800
- - - - - - - - - - $38,169 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$38,169
-
$
-
-
$
02: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$22,000
Cost:
$50,000
- - - - - - - - - - - - $22,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
$22,000
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,603
Cost:
$62,600
$16,603 219,912 - - - - - - - - - - - - $16,603
219,912
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,314
Cost:
$28,000
- - - - - - $13,314 4,755 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,314
4,755
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,298
Cost:
$17,500
$10,766 138,555 - - $1,532 236 - - - - - - - - $10,766
138,555
kWh
-
-
kW-months/year
$1,532
236
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,958
Cost:
$13,000
- - - - - - - - $5,958 2,128 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$5,958
2,128
MMBtu
-
-
$
-
-
$
07: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,951
Cost:
$1,200
- - - - $5,951 917 - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,951
917
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,012
Cost:
$10,200
$4,012 53,139 - - - - - - - - - - - - $4,012
53,139
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,884
Cost:
$2,000
- - - - - - $1,884 673 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,884
673
MMBtu
-
-
MMBtu
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,424
Cost:
$2,000
$1,424 18,330 - - - - - - - - - - - - $1,424
18,330
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,408
Cost:
$800
- - - - - - $1,408 503 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,408
503
MMBtu
-
-
MMBtu
-
-
$
-
-
$
12: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,325
Cost:
$4,500
- - $1,325 766 - - - - - - - - - - -
-
kWh
$1,325
766
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$124,346
Cost:
$271,600
$32,805 429,936 $1,325 766 $7,483 1,153 $16,606 5,931 $5,958 2,128 $38,169 - $22,000 - $32,805
429,936
kWh
$1,325
766
kW-months/year
$7,483
1,153
MMBtu
$16,606
5,931
MMBtu
$5,958
2,128
MMBtu
$38,169
-
$
$22,000
-
$
TOTAL IMPLEMENTED Savings:
$44,406
Cost:
$76,000
$12,190 156,885 $1,325 766 $7,483 1,153 $1,408 503 - - - - $22,000 - $12,190
156,885
kWh
$1,325
766
kW-months/year
$7,483
1,153
MMBtu
$1,408
503
MMBtu
-
-
MMBtu
-
-
$
$22,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Wood Other Energy Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #2 Wood Other Energy Administrative Changes Primary Raw Material