IAC logo
IAC Assessment: MA0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2001
Principal Product Eastern White Pine Board
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 235
Plant Area (Sq.Ft.) 170,000
Annual Production 65,000 Thousand Feet
Production Hrs. Annual 4,940
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,318,223 19,441,380 kWh $0.07
Electricity Demand $274,437 42,403 kW-months/year $6.47
Electricity Fees $14,725 - $ -
Wood $283,007 196,627 MMBtu $1.44
TOTAL ENERGY COSTS $1,890,392
RECOMMENDED SAVINGS* $159,102 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,989
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Administrative Changes Electricity Usage Electricity Demand Wood Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$47,575
Cost:
$350,000
$63,255 859,443 $4,628 696 $(-15,308) (-5,467) $(-5,000) - $63,255
859,443
kWh
$4,628
696
kW-months/year
$(-15,308)
(-5,467)
MMBtu
$(-5,000)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,719
Cost:
$45,000
$12,548 170,486 - - $29,171 33,608 - - $12,548
170,486
kWh
-
-
kW-months/year
$29,171
33,608
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,719
Cost:
$20,000
$21,719 259,100 - - - - - - $21,719
259,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,725
Cost:
$35,000
- - $14,725 22,655 - - - - -
-
kWh
$14,725
22,655
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,562
Cost:
$18,000
$13,562 184,270 - - - - - - $13,562
184,270
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,262
Cost:
$10,000
$9,262 125,847 - - - - - - $9,262
125,847
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,051
Cost:
$12,900
$5,051 68,630 - - - - - - $5,051
68,630
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,264
Cost:
$2,000
$4,264 57,930 - - - - - - $4,264
57,930
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,225
Cost:
$5,950
$1,225 16,644 - - - - - - $1,225
16,644
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$159,102
Cost:
$498,850
$130,886 1,742,350 $19,353 23,351 $13,863 28,141 $(-5,000) - $130,886
1,742,350
kWh
$19,353
23,351
kW-months/year
$13,863
28,141
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$18,989
Cost:
$37,000
$4,264 57,930 $14,725 22,655 - - - - $4,264
57,930
kWh
$14,725
22,655
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Administrative Changes Electricity Usage Electricity Demand Wood Administrative Changes