IAC logo
IAC Assessment: MA0514
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Commercial Printing
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 65,000
Annual Production 15,500,000 Pounds
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $204,302 2,812,074 kWh $0.07
Electricity Demand $129,572 15,344 kW-months/year $8.44
Electricity Fees $4,236 - $ -
LPG $21,020 2,633 MMBtu $7.98
Fuel Oil #2 $20,137 3,585 MMBtu $5.62
Other Energy $84,836 9,285 MMBtu $9.14
TOTAL ENERGY COSTS $464,103
RECOMMENDED SAVINGS* $59,956 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,852
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Other Energy Personnel Changes Electricity Usage Electricity Demand LPG Fuel Oil #2 Other Energy Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$40,968
Cost:
$200,000
$9,919 156,520 $43,645 5,388 - - - - $(-10,596) (-1,409) $(-2,000) - $9,919
156,520
kWh
$43,645
5,388
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-10,596)
(-1,409)
MMBtu
$(-2,000)
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,996
Cost:
$5,000
- - - - $4,996 802 - - - - - - -
-
kWh
-
-
kW-months/year
$4,996
802
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,892
Cost:
-
$1,896 29,915 - - - - $2,996 558 - - - - $1,896
29,915
kWh
-
-
kW-months/year
-
-
MMBtu
$2,996
558
MMBtu
-
-
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,569
Cost:
-
$1,868 34,400 - - - - $2,701 503 - - - - $1,868
34,400
kWh
-
-
kW-months/year
-
-
MMBtu
$2,701
503
MMBtu
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,407
Cost:
-
$1,652 26,061 $755 50 - - - - - - - - $1,652
26,061
kWh
$755
50
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,214
Cost:
$500
$1,214 19,163 - - - - - - - - - - $1,214
19,163
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$519
Cost:
$900
- - - - - - - - $519 69 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$519
69
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$214
Cost:
$262
$214 3,370 - - - - - - - - - - $214
3,370
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$177
Cost:
$281
- - - - - - $177 33 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$177
33
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$59,956
Cost:
$206,943
$16,763 269,429 $44,400 5,438 $4,996 802 $5,874 1,094 $(-10,077) (-1,340) $(-2,000) - $16,763
269,429
kWh
$44,400
5,438
kW-months/year
$4,996
802
MMBtu
$5,874
1,094
MMBtu
$(-10,077)
(-1,340)
MMBtu
$(-2,000)
-
$
TOTAL IMPLEMENTED Savings:
$10,852
Cost:
$781
$4,978 83,478 - - - - $5,874 1,094 - - - - $4,978
83,478
kWh
-
-
kW-months/year
-
-
MMBtu
$5,874
1,094
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand LPG Fuel Oil #2 Other Energy Personnel Changes Electricity Usage Electricity Demand LPG Fuel Oil #2 Other Energy Personnel Changes