IAC logo
IAC Assessment: MA0525
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0525
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Matboard products
NAICS n/a
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 152,000
Annual Production 12,860 Tons
Production Hrs. Annual 2,040
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,306 641,714 kWh $0.07
Electricity Demand $19,825 2,924 kW-months/year $6.78
Electricity Fees $9,037 - $ -
Fuel Oil #2 $52,117 7,238 MMBtu $7.20
TOTAL ENERGY COSTS $127,285
RECOMMENDED SAVINGS* $13,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$10,201
Cost:
$800
- - - - $10,201 1,478 -
-
kWh
-
-
kW-months/year
$10,201
1,478
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,687
Cost:
$5,159
- - - - $1,687 246 -
-
kWh
-
-
kW-months/year
$1,687
246
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$791
Cost:
-
$791 12,376 - - - - $791
12,376
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$582
Cost:
$200
$362 5,658 $220 33 - - $362
5,658
kWh
$220
33
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$425
Cost:
$596
- - - - $425 62 -
-
kWh
-
-
kW-months/year
$425
62
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$101
Cost:
-
$101 1,583 - - - - $101
1,583
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$80
Cost:
$300
$80 1,242 - - - - $80
1,242
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,867
Cost:
$7,055
$1,334 20,859 $220 33 $12,313 1,786 $1,334
20,859
kWh
$220
33
kW-months/year
$12,313
1,786
MMBtu
TOTAL IMPLEMENTED Savings:
$12,100
Cost:
$1,596
$1,254 19,617 $220 33 $10,626 1,540 $1,254
19,617
kWh
$220
33
kW-months/year
$10,626
1,540
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2