IAC logo
IAC Assessment: MA0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Electrical connectors
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $50,000,000-$100,000,000
# of Employees 206
Plant Area (Sq.Ft.) 130,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,460 3,562,800 kWh $0.05
Electricity Demand $90,081 10,156 kW-months/year $8.87
Electricity Fees $544 - $ -
Fuel Oil #2 $35,148 4,663 MMBtu $7.54
TOTAL ENERGY COSTS $323,817
RECOMMENDED SAVINGS* $41,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,855
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,973
Cost:
$48,190
$23,872 439,636 $8,301 936 $(-13,200) (-1,875) $23,872
439,636
kWh
$8,301
936
kW-months/year
$(-13,200)
(-1,875)
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$9,180
Cost:
$16,000
- - - - $9,180 1,304 -
-
kWh
-
-
kW-months/year
$9,180
1,304
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,167
Cost:
$9,862
- - - - $7,167 1,018 -
-
kWh
-
-
kW-months/year
$7,167
1,018
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,752
Cost:
-
- - - - $3,752 533 -
-
kWh
-
-
kW-months/year
$3,752
533
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,103
Cost:
$1,325
$2,103 38,738 - - - - $2,103
38,738
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$41,175
Cost:
$75,377
$25,975 478,374 $8,301 936 $6,899 980 $25,975
478,374
kWh
$8,301
936
kW-months/year
$6,899
980
MMBtu
TOTAL IMPLEMENTED Savings:
$5,855
Cost:
$1,325
$2,103 38,738 - - $3,752 533 $2,103
38,738
kWh
-
-
kW-months/year
$3,752
533
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2