IAC logo
IAC Assessment: MA0529
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0529
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Hardwood furniture
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 140,200
Annual Production 3,800 Thousand Feet
Production Hrs. Annual 4,335
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $265,244 3,516,335 kWh $0.08
Electricity Fees $14,300 - $ -
Fuel Oil #2 $8,642 1,318 MMBtu $6.56
Wood $63,257 27,833 MMBtu $2.27
TOTAL ENERGY COSTS $357,449
RECOMMENDED SAVINGS* $166,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,132
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Wood Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Wood
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
01: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$132,710
Cost:
$407,000
$234,477 2,879,329 $52,819 7,622 - - $(-148,257) (-23,062) $(-6,329) (-2,788) $234,477
2,879,329
kWh
$52,819
7,622
kW-months/year
-
-
$
$(-148,257)
(-23,062)
MMBtu
$(-6,329)
(-2,788)
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,152
Cost:
$66,000
- - - - - - - - $15,152 6,675 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$15,152
6,675
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,301
Cost:
$13,950
$6,301 87,451 - - - - - - - - $6,301
87,451
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,609
Cost:
$30,000
- - - - - - - - $7,609 3,352 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,609
3,352
MMBtu
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,902
Cost:
$345
- - - - $2,902 - - - - - -
-
kWh
-
-
kW-months/year
$2,902
-
$
-
-
MMBtu
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,837
Cost:
$827
- - - - - - - - $1,837 619 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,837
619
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$295
Cost:
$600
- - - - - - - - $295 197 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$295
197
MMBtu
TOTAL RECOMMENDED Savings:
$166,806
Cost:
$518,722
$240,778 2,966,780 $52,819 7,622 $2,902 - $(-148,257) (-23,062) $18,564 8,055 $240,778
2,966,780
kWh
$52,819
7,622
kW-months/year
$2,902
-
$
$(-148,257)
(-23,062)
MMBtu
$18,564
8,055
MMBtu
TOTAL IMPLEMENTED Savings:
$2,132
Cost:
$1,427
- - - - - - - - $2,132 816 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,132
816
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Wood Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Wood