IAC logo
IAC Assessment: MA0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Metal saw blades
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3425 - Saw Blades And Handsaws
Sales $10,000,000-$50,000,000
# of Employees 484
Plant Area (Sq.Ft.) 410,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $971,908 11,451,452 kWh $0.08
Electricity Demand $175,104 26,107 kW-months/year $6.71
Electricity Fees $4,688 - $ -
Natural Gas $176,635 25,811 MMBtu $6.84
LPG $8,618 1,253 MMBtu $6.88
Fuel Oil #2 $33,092 4,826 MMBtu $6.86
Fuel Oil #6 $69,280 16,454 MMBtu $4.21
TOTAL ENERGY COSTS $1,439,325
RECOMMENDED SAVINGS* $439,483 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Consumption By-product Production Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Consumption By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$233,841
Cost:
$25,050
- - - - - - - - $233,841 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$233,841
-
Tgal
-
-
$
02: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$56,030
Cost:
$207,000
$(-29,199) (-349,272) $(-15,684) (-2,310) - - - - - - $100,913 - $(-29,199)
(-349,272)
kWh
$(-15,684)
(-2,310)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$100,913
-
$
03: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$83,099
Cost:
$162,400
$2,457 29,784 $277 41 - - $6,365 1,512 - - $74,000 - $2,457
29,784
kWh
$277
41
kW-months/year
-
-
MMBtu
$6,365
1,512
MMBtu
-
-
Tgal
$74,000
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,234
Cost:
$30,400
$30,234 420,497 - - - - - - - - - - $30,234
420,497
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,046
Cost:
$9,100
$7,046 84,283 - - - - - - - - - - $7,046
84,283
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,396
Cost:
$9,900
- - - - $1,637 373 $6,759 1,538 - - - - -
-
kWh
-
-
kW-months/year
$1,637
373
MMBtu
$6,759
1,538
MMBtu
-
-
Tgal
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,661
Cost:
$400
$9,567 114,492 $1,094 157 - - - - - - - - $9,567
114,492
kWh
$1,094
157
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$8,213
Cost:
$26,700
- - - - $4,519 877 $3,694 888 - - - - -
-
kWh
-
-
kW-months/year
$4,519
877
MMBtu
$3,694
888
MMBtu
-
-
Tgal
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,271
Cost:
$2,750
$1,144 13,682 $127 19 - - - - - - - - $1,144
13,682
kWh
$127
19
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$692
Cost:
$1,275
- - - - - - - - - - $692 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$692
-
$
TOTAL RECOMMENDED Savings:
$439,483
Cost:
$474,975
$21,249 313,466 $(-14,186) (-2,093) $6,156 1,250 $16,818 3,938 $233,841 - $175,605 - $21,249
313,466
kWh
$(-14,186)
(-2,093)
kW-months/year
$6,156
1,250
MMBtu
$16,818
3,938
MMBtu
$233,841
-
Tgal
$175,605
-
$
TOTAL IMPLEMENTED Savings:
$12,624
Cost:
$4,425
$10,711 128,174 $1,221 176 - - - - - - $692 - $10,711
128,174
kWh
$1,221
176
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$692
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Consumption By-product Production Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Consumption By-product Production