IAC Assessment: MA0531
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0531
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2003
Principal Product Cowhide split and top-grade leather
NAICS 316110 - Leather and Hide Tanning and Finishing
SIC 3111 - Leather Tanning And Finishing
Sales $5,000,000-$10,000,000
# of Employees 44
Plant Area (Sq.Ft.) 60,000
Annual Production 49,000 Thousand Feet
Production Hrs. Annual 2,328
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,262 1,194,327 kWh $0.08
Electricity Demand $52,025 4,592 kW-months/year $11.33
Electricity Fees $5,810 - $ -
LPG $22,184 2,116 MMBtu $10.48
Fuel Oil #4 $48,517 10,296 MMBtu $4.71
TOTAL ENERGY COSTS $282,329
RECOMMENDED SAVINGS* $63,156 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Increase in Production Electricity Usage Electricity Demand Fuel Oil #4 Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$31,336
Cost:
$37,543
- - - - - - $31,336 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$31,336
-
%
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$21,438
Cost:
$43,874
- - - - - - $21,438 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,438
-
%
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,738
Cost:
$6,375
$3,339 40,723 $1,399 210 - - - - $3,339
40,723
kWh
$1,399
210
kW-months/year
-
-
MMBtu
-
-
%
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,667
Cost:
$4,205
- - $2,667 402 - - - - -
-
kWh
$2,667
402
kW-months/year
-
-
MMBtu
-
-
%
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,532
Cost:
$6,800
$1,786 21,790 $746 112 - - - - $1,786
21,790
kWh
$746
112
kW-months/year
-
-
MMBtu
-
-
%
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$445
Cost:
$383
- - - - $445 81 - - -
-
kWh
-
-
kW-months/year
$445
81
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$63,156
Cost:
$99,180
$5,125 62,513 $4,812 724 $445 81 $52,774 - $5,125
62,513
kWh
$4,812
724
kW-months/year
$445
81
MMBtu
$52,774
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Fuel Oil #4 Increase in Production Electricity Usage Electricity Demand Fuel Oil #4 Increase in Production