Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2003 |
Principal Product | Business forms |
NAICS | 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671 - Paper Coated & Laminated, Packaging |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 146,000 |
Annual Production | 52,000,000 Pounds |
Production Hrs. Annual | 6,200 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $849,046 | 10,953,500 | kWh | $0.08 |
Electricity Demand | $143,159 | 24,547 | kW-months/year | $5.83 |
Electricity Fees | $5,093 | - | $ | - |
Fuel Oil #2 | $119,273 | 18,694 | MMBtu | $6.38 |
TOTAL ENERGY COSTS | $1,116,571 | |||
RECOMMENDED SAVINGS* | $54,177 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,080 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $14,636 Cost: $22,869 |
- | - | $14,636 | 2,100 | - | - |
- - kWh |
$14,636 2,100 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,600 Cost: $21,400 |
$13,600 | 185,400 | - | - | - | - |
$13,600 185,400 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $9,202 Cost: $3,400 |
$5,738 | 76,500 | - | - | $3,464 | 543 |
$5,738 76,500 kWh |
- - kW-months/year |
$3,464 543 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $8,465 Cost: - |
$8,465 | 110,800 | - | - | - | - |
$8,465 110,800 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,383 Cost: - |
$4,383 | 49,900 | - | - | - | - |
$4,383 49,900 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $2,232 Cost: $500 |
- | - | - | - | $2,232 | 351 |
- - kWh |
- - kW-months/year |
$2,232 351 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,659 Cost: $3,400 |
$1,659 | 18,900 | - | - | - | - |
$1,659 18,900 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $54,177 Cost: $51,569 |
$33,845 | 441,500 | $14,636 | 2,100 | $5,696 | 894 | $33,845 441,500 kWh |
$14,636 2,100 kW-months/year |
$5,696 894 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,080 Cost: $500 |
$12,848 | 160,700 | - | - | $2,232 | 351 | $12,848 160,700 kWh |
- - kW-months/year |
$2,232 351 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 |