Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2004 |
Principal Product | Natural fiber fabric |
NAICS | 313220 - Narrow Fabric Mills and Schiffli Machine Embroidery |
SIC | 2241 - Narrow Fabric Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 195 |
Plant Area (Sq.Ft.) | 542,304 |
Annual Production | 5,500 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $450,221 | 8,060,028 | kWh | $0.06 |
Electricity Demand | $213,188 | 23,874 | kW-months/year | $8.93 |
Electricity Fees | $(-6,785) | - | $ | - |
LPG | $98,707 | 8,475 | MMBtu | $11.65 |
Fuel Oil #2 | $261,229 | 36,265 | MMBtu | $7.20 |
Fuel Oil #6 | $100,211 | 17,270 | MMBtu | $5.80 |
TOTAL ENERGY COSTS | $1,116,771 | |||
RECOMMENDED SAVINGS* | $387,459 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Fuel Oil #6 | By-product Production | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Fuel Oil #6 | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $200,000 Cost: $398,000 |
- | - | - | - | - | - | - | - | - | - | $200,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
$200,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY |
Savings: $50,195 Cost: $210,000 |
$42,332 | 774,300 | $17,863 | 2,160 | - | - | - | - | - | - | $(-10,000) | - |
$42,332 774,300 kWh |
$17,863 2,160 kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
$(-10,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $43,010 Cost: $24,670 |
- | - | - | - | - | - | $31,659 | 4,033 | $11,351 | 1,867 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$31,659 4,033 MMBtu |
$11,351 1,867 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $34,463 Cost: $78,000 |
$2,561 | 47,600 | - | - | - | - | $31,902 | 4,064 | - | - | - | - |
$2,561 47,600 kWh |
- - kW-months/year |
- - MMBtu |
$31,902 4,064 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $14,711 Cost: $44,000 |
- | - | - | - | - | - | - | - | $14,711 | 1,874 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$14,711 1,874 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $14,705 Cost: $4,020 |
- | - | - | - | - | - | - | - | $14,705 | 2,125 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$14,705 2,125 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $13,419 Cost: - |
- | - | - | - | - | - | - | - | $13,419 | 2,207 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$13,419 2,207 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,117 Cost: $6,600 |
$7,117 | 125,400 | - | - | - | - | - | - | - | - | - | - |
$7,117 125,400 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,321 Cost: $10,950 |
$3,321 | 54,800 | - | - | - | - | - | - | - | - | - | - |
$3,321 54,800 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,829 Cost: $7,475 |
$1,109 | 18,300 | $2,729 | 330 | $(-1,009) | (-78) | - | - | - | - | - | - |
$1,109 18,300 kWh |
$2,729 330 kW-months/year |
$(-1,009) (-78) MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $1,964 Cost: $2,400 |
$1,964 | 36,500 | - | - | - | - | - | - | - | - | - | - |
$1,964 36,500 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,376 Cost: $825 |
$1,376 | 22,700 | - | - | - | - | - | - | - | - | - | - |
$1,376 22,700 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $349 Cost: $1,400 |
- | - | - | - | - | - | $349 | 37 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$349 37 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $387,459 Cost: $788,340 |
$59,780 | 1,079,600 | $20,592 | 2,490 | $(-1,009) | (-78) | $63,910 | 8,134 | $54,186 | 8,073 | $190,000 | - | $59,780 1,079,600 kWh |
$20,592 2,490 kW-months/year |
$(-1,009) (-78) MMBtu |
$63,910 8,134 MMBtu |
$54,186 8,073 MMBtu |
$190,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Fuel Oil #6 | By-product Production | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Fuel Oil #6 | By-product Production |