IAC Assessment: MA0550
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Flexible poyurethane foam
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 49
Plant Area (Sq.Ft.) 129,500
Annual Production 60,000 Thousand Feet
Production Hrs. Annual 2,860
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,542 1,152,224 kWh $0.07
Electricity Demand $32,017 5,048 kW-months/year $6.34
Electricity Fees $807 - $ -
Natural Gas $73,340 7,289 MMBtu $10.06
TOTAL ENERGY COSTS $193,944
RECOMMENDED SAVINGS* $114,888 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Personnel Changes Electricity Usage Natural Gas Fuel Oil #2 Personnel Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$86,929
Cost:
$32,965
- - $50,983 5,073 $35,946 (-5,073) - - -
-
kWh
$50,983
5,073
MMBtu
$35,946
(-5,073)
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,960
Cost:
$23,000
$(-2,231) (-26,100) $18,191 1,810 - - - - $(-2,231)
(-26,100)
kWh
$18,191
1,810
MMBtu
-
-
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,668
Cost:
$2,066
$668 8,100 - - - - $10,000 - $668
8,100
kWh
-
-
MMBtu
-
-
MMBtu
$10,000
-
$
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$599
Cost:
-
$599 7,000 - - - - - - $599
7,000
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$547
Cost:
-
$547 6,400 - - - - - - $547
6,400
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$185
Cost:
$120
$185 2,300 - - - - - - $185
2,300
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$114,888
Cost:
$58,151
$(-232) (-2,300) $69,174 6,883 $35,946 (-5,073) $10,000 - $(-232)
(-2,300)
kWh
$69,174
6,883
MMBtu
$35,946
(-5,073)
MMBtu
$10,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Personnel Changes Electricity Usage Natural Gas Fuel Oil #2 Personnel Changes