Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2004 |
Principal Product | Porous plug wrap and tobacco sheet |
NAICS | 322121 - Paper (except Newsprint) Mills |
SIC | 2621 - Paper Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 114,000 |
Annual Production | 11,000 Tons |
Production Hrs. Annual | 8,640 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $996,080 | 19,211,220 | kWh | $0.05 |
Electricity Demand | $172,555 | 32,233 | kW-months/year | $5.35 |
Electricity Fees | $3,025 | - | $ | - |
Fuel Oil #6 | $1,032,472 | 193,500 | MMBtu | $5.34 |
TOTAL ENERGY COSTS | $2,204,132 | |||
RECOMMENDED SAVINGS* | $378,650 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,254 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Electricity Usage | Electricity Demand | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $239,059 Cost: $699,000 |
$(-6,348) | (-135,350) | $(-1,358) | (-251) | $246,765 | 44,785 |
$(-6,348) (-135,350) kWh |
$(-1,358) (-251) kW-months/year |
$246,765 44,785 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $70,580 Cost: $123,500 |
$(-1,857) | (-39,600) | $(-460) | (-85) | $72,897 | 13,230 |
$(-1,857) (-39,600) kWh |
$(-460) (-85) kW-months/year |
$72,897 13,230 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $36,905 Cost: $15,475 |
$31,809 | 678,200 | $5,096 | 942 | - | - |
$31,809 678,200 kWh |
$5,096 942 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $16,513 Cost: $4,078 |
- | - | - | - | $16,513 | 2,997 |
- - kWh |
- - kW-months/year |
$16,513 2,997 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,349 Cost: $11,346 |
$6,332 | 135,000 | $1,017 | 188 | - | - |
$6,332 135,000 kWh |
$1,017 188 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,861 Cost: $14,400 |
$5,914 | 126,100 | $947 | 175 | - | - |
$5,914 126,100 kWh |
$947 175 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,383 Cost: $333 |
- | - | - | - | $1,383 | 251 |
- - kWh |
- - kW-months/year |
$1,383 251 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $378,650 Cost: $868,132 |
$35,850 | 764,350 | $5,242 | 969 | $337,558 | 61,263 | $35,850 764,350 kWh |
$5,242 969 kW-months/year |
$337,558 61,263 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,254 Cost: $26,821 |
$38,141 | 813,200 | $6,113 | 1,130 | - | - | $38,141 813,200 kWh |
$6,113 1,130 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Electricity Usage | Electricity Demand | Fuel Oil #6 |