IAC Assessment: MA0566
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0566
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2004
Principal Product Paper products
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 104,500
Annual Production 30,600 Tons
Production Hrs. Annual 8,640
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,134,119 16,596,400 kWh $0.07
Electricity Demand $315,733 31,858 kW-months/year $9.91
Electricity Fees $5,376 - $ -
Fuel Oil #6 $1,142,152 175,792 MMBtu $6.50
TOTAL ENERGY COSTS $2,597,380
RECOMMENDED SAVINGS* $469,096 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $301,681
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$148,951
Cost:
$35,885
- - - - $150,951 22,941 $(-2,000) - -
-
kWh
-
-
kW-months/year
$150,951
22,941
MMBtu
$(-2,000)
-
$
02: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$113,441
Cost:
$191,180
$227,585 2,891,809 $8,822 1,273 $(-111,399) (-16,930) $(-11,567) - $227,585
2,891,809
kWh
$8,822
1,273
kW-months/year
$(-111,399)
(-16,930)
MMBtu
$(-11,567)
-
$
03: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$75,183
Cost:
$1,350
- - - - $75,183 11,426 - - -
-
kWh
-
-
kW-months/year
$75,183
11,426
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$69,926
Cost:
$70,000
- - - - $69,926 10,627 - - -
-
kWh
-
-
kW-months/year
$69,926
10,627
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$33,400
Cost:
$20,000
- - - - $33,400 5,079 - - -
-
kWh
-
-
kW-months/year
$33,400
5,079
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,306
Cost:
$16,750
- - - - $22,306 3,390 - - -
-
kWh
-
-
kW-months/year
$22,306
3,390
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,889
Cost:
$3,076
- - - - $5,889 895 - - -
-
kWh
-
-
kW-months/year
$5,889
895
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$469,096
Cost:
$338,241
$227,585 2,891,809 $8,822 1,273 $246,256 37,428 $(-13,567) - $227,585
2,891,809
kWh
$8,822
1,273
kW-months/year
$246,256
37,428
MMBtu
$(-13,567)
-
$
TOTAL IMPLEMENTED Savings:
$301,681
Cost:
$250,141
$227,585 2,891,809 $8,822 1,273 $78,841 11,985 $(-13,567) - $227,585
2,891,809
kWh
$8,822
1,273
kW-months/year
$78,841
11,985
MMBtu
$(-13,567)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes