IAC Assessment: MA0575
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0575
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2005
Principal Product Vinegar, apple juice and mustard
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 68,000
Annual Production 6,600 Thousand Gallons
Production Hrs. Annual 2,288
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $248,418 2,829,207 kWh $0.09
Electricity Demand $43,888 14,961 kW-months/year $2.93
Natural Gas $37,456 3,001 MMBtu $12.48
LPG $117,237 12,994 MMBtu $9.02
TOTAL ENERGY COSTS $446,999
RECOMMENDED SAVINGS* $118,151 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $116,383
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Primary Product Electricity Usage Electricity Demand LPG Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$68,834
Cost:
$23,508
- - - - $68,834 6,124 - - -
-
kWh
-
-
kW-months/year
$68,834
6,124
MMBtu
-
-
$
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$26,800
Cost:
$41,620
- - - - $(-18,400) (-1,637) $45,200 - -
-
kWh
-
-
kW-months/year
$(-18,400)
(-1,637)
MMBtu
$45,200
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$18,805
Cost:
$517
- - - - $18,805 1,673 - - -
-
kWh
-
-
kW-months/year
$18,805
1,673
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,944
Cost:
$7,285
- - - - $1,944 173 - - -
-
kWh
-
-
kW-months/year
$1,944
173
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,023
Cost:
-
$660 7,100 $363 44 - - - - $660
7,100
kWh
$363
44
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$512
Cost:
$195
$512 5,500 - - - - - - $512
5,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$233
Cost:
$30
$233 2,300 - - - - - - $233
2,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$118,151
Cost:
$73,155
$1,405 14,900 $363 44 $71,183 6,333 $45,200 - $1,405
14,900
kWh
$363
44
kW-months/year
$71,183
6,333
MMBtu
$45,200
-
$
TOTAL IMPLEMENTED Savings:
$116,383
Cost:
$72,930
- - - - $71,183 6,333 $45,200 - -
-
kWh
-
-
kW-months/year
$71,183
6,333
MMBtu
$45,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Primary Product Electricity Usage Electricity Demand LPG Primary Product