IAC logo
IAC Assessment: MA0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2005
Principal Product Brown Aluminum Oxide Abrasives
NAICS 327910 - Abrasive Product Manufacturing
SIC 3291 - Abrasive Products
Sales $10,000,000-$50,000,000
# of Employees 106
Plant Area (Sq.Ft.) 25,040
Annual Production 30,000 Tons
Production Hrs. Annual 4,250
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,715 2,280,800 kWh $0.08
Electricity Demand $33,575 7,038 kW-months/year $4.77
Electricity Fees $1,200 - $ -
Natural Gas $238,671 23,614 MMBtu $10.11
TOTAL ENERGY COSTS $467,161
RECOMMENDED SAVINGS* $18,226 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,401
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,369
Cost:
$2,100
- - $6,369 704 -
-
kWh
$6,369
704
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,880
Cost:
$2,800
- - $3,880 465 -
-
kWh
$3,880
465
MMBtu
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,727
Cost:
$11,326
- - $3,727 412 -
-
kWh
$3,727
412
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,152
Cost:
$1,400
- - $2,152 258 -
-
kWh
$2,152
258
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,098
Cost:
$9,400
$2,098 25,500 - - $2,098
25,500
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,226
Cost:
$27,026
$2,098 25,500 $16,128 1,839 $2,098
25,500
kWh
$16,128
1,839
MMBtu
TOTAL IMPLEMENTED Savings:
$12,401
Cost:
$6,300
- - $12,401 1,427 -
-
kWh
$12,401
1,427
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas