Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2006 |
Principal Product | Hot stam foil |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3497 - Metal Foil And Leaf |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 937,500 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $417,519 | 4,778,250 | kWh | $0.09 |
Electricity Demand | $56,108 | 10,889 | kW-months/year | $5.15 |
Electricity Fees | $847 | - | $ | - |
Natural Gas | $148,427 | 13,429 | MMBtu | $11.05 |
TOTAL ENERGY COSTS | $622,901 | |||
RECOMMENDED SAVINGS* | $53,400 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,092 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $25,107 Cost: $85,300 |
$25,107 | 273,500 | - | - | - | - | - | - |
$25,107 273,500 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,984 Cost: $17,660 |
$8,555 | 93,200 | $1,429 | 179 | - | - | - | - |
$8,555 93,200 kWh |
$1,429 179 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,643 Cost: $17,818 |
- | - | - | - | $5,643 | 457 | - | - |
- - kWh |
- - kW-months/year |
$5,643 457 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $4,902 Cost: $1,000 |
- | - | - | - | $4,902 | 397 | - | - |
- - kWh |
- - kW-months/year |
$4,902 397 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT |
Savings: $3,292 Cost: $19,000 |
$(-83) | (-900) | - | - | - | - | $3,375 | - |
$(-83) (-900) kWh |
- - kW-months/year |
- - MMBtu |
$3,375 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,161 Cost: $668 |
- | - | - | - | $2,161 | 175 | - | - |
- - kWh |
- - kW-months/year |
$2,161 175 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,402 Cost: - |
$1,202 | 13,100 | $200 | 25 | - | - | - | - |
$1,202 13,100 kWh |
$200 25 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $909 Cost: $775 |
$909 | 9,900 | - | - | - | - | - | - |
$909 9,900 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,400 Cost: $142,221 |
$35,690 | 388,800 | $1,629 | 204 | $12,706 | 1,029 | $3,375 | - | $35,690 388,800 kWh |
$1,629 204 kW-months/year |
$12,706 1,029 MMBtu |
$3,375 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,092 Cost: $37,146 |
$9,757 | 106,300 | $1,629 | 204 | $12,706 | 1,029 | - | - | $9,757 106,300 kWh |
$1,629 204 kW-months/year |
$12,706 1,029 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production |