Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2007 |
Principal Product | Consoles, enclosures, office & technical furniture |
NAICS | 337214 - Office Furniture (except Wood) Manufacturing |
SIC | 2522 - Office Furniture, Except Wood |
Sales | $50,000,000-$100,000,000 |
# of Employees | 327 |
Plant Area (Sq.Ft.) | 460,320 |
Annual Production | 16,000,000 Pounds |
Production Hrs. Annual | 4,600 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $766,338 | 6,024,000 | kWh | $0.13 |
Electricity Demand | $86,293 | 16,920 | kW-months/year | $5.10 |
Natural Gas | $418,680 | 31,868 | MMBtu | $13.14 |
Fuel Oil #2 | $80,194 | 5,558 | MMBtu | $14.43 |
TOTAL ENERGY COSTS | $1,351,505 | |||
RECOMMENDED SAVINGS* | $172,520 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $109,410 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $57,604 Cost: $84,300 |
$53,326 | 380,900 | $4,278 | 920 | - | - | - | - |
$53,326 380,900 kWh |
$4,278 920 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $44,050 Cost: $100,800 |
$27,370 | 195,500 | - | - | $16,680 | 1,673 | - | - |
$27,370 195,500 kWh |
- - kW-months/year |
$16,680 1,673 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $15,125 Cost: - |
$14,000 | 100,000 | $1,125 | 242 | - | - | - | - |
$14,000 100,000 kWh |
$1,125 242 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $13,561 Cost: $53,848 |
$(-9,604) | (-68,600) | $(-832) | (-179) | $23,997 | 2,407 | - | - |
$(-9,604) (-68,600) kWh |
$(-832) (-179) kW-months/year |
$23,997 2,407 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,214 Cost: $800 |
$11,214 | 80,100 | - | - | - | - | - | - |
$11,214 80,100 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $10,518 Cost: $13,000 |
- | - | - | - | $10,518 | 1,055 | - | - |
- - kWh |
- - kW-months/year |
$10,518 1,055 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $8,155 Cost: - |
$7,770 | 55,500 | $385 | 83 | - | - | - | - |
$7,770 55,500 kWh |
$385 83 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,499 Cost: $15,500 |
$6,286 | 44,900 | $958 | 206 | $(-1,745) | (-175) | - | - |
$6,286 44,900 kWh |
$958 206 kW-months/year |
$(-1,745) (-175) MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $4,673 Cost: $18,500 |
- | - | $4,673 | 1,005 | - | - | - | - |
- - kWh |
$4,673 1,005 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,121 Cost: $3,200 |
- | - | - | - | - | - | $2,121 | 147 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,121 147 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $172,520 Cost: $289,948 |
$110,362 | 788,300 | $10,587 | 2,277 | $49,450 | 4,960 | $2,121 | 147 | $110,362 788,300 kWh |
$10,587 2,277 kW-months/year |
$49,450 4,960 MMBtu |
$2,121 147 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $109,410 Cost: $119,800 |
$86,310 | 616,500 | $10,461 | 2,250 | $10,518 | 1,055 | $2,121 | 147 | $86,310 616,500 kWh |
$10,461 2,250 kW-months/year |
$10,518 1,055 MMBtu |
$2,121 147 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 |