IAC Assessment: MA0618
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0618
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product glass bulbs
NAICS 327212 - Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229 - Pressed And Blown Glass, Nec
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 600,000
Annual Production 10,000 Tons
Production Hrs. Annual 8,341
Location (State) RI
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,667,831 21,769,461 kWh $0.12
Electricity Demand $107,099 34,919 kW-months/year $3.07
Electricity Fees $(-14,827) - $ -
Natural Gas $1,983,124 194,919 MMBtu $10.17
TOTAL ENERGY COSTS $4,743,227
RECOMMENDED SAVINGS* $133,704 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $133,704
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,879
Cost:
$79,554
$46,191 401,662 $1,688 578 - - $46,191
401,662
kWh
$1,688
578
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,820
Cost:
$26,621
$31,664 275,340 $1,156 396 - - $31,664
275,340
kWh
$1,156
396
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,316
Cost:
$3,220
- - - - $12,316 1,151 -
-
kWh
-
-
kW-months/year
$12,316
1,151
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,204
Cost:
$29,875
$11,772 102,363 $432 148 - - $11,772
102,363
kWh
$432
148
kW-months/year
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,589
Cost:
$17,740
$15,456 134,400 $526 180 $(-5,393) (-504) $15,456
134,400
kWh
$526
180
kW-months/year
$(-5,393)
(-504)
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,795
Cost:
$1,924
$7,795 67,779 - - - - $7,795
67,779
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,906
Cost:
$18,500
- - $4,906 1,680 - - -
-
kWh
$4,906
1,680
kW-months/year
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,125
Cost:
$3,552
$1,086 9,445 - - $3,039 284 $1,086
9,445
kWh
-
-
kW-months/year
$3,039
284
MMBtu
09: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$1,070
Cost:
$340
- - - - $1,070 95 -
-
kWh
-
-
kW-months/year
$1,070
95
MMBtu
TOTAL RECOMMENDED Savings:
$133,704
Cost:
$181,326
$113,964 990,989 $8,708 2,982 $11,032 1,026 $113,964
990,989
kWh
$8,708
2,982
kW-months/year
$11,032
1,026
MMBtu
TOTAL IMPLEMENTED Savings:
$133,704
Cost:
$181,326
$113,964 990,989 $8,708 2,982 $11,032 1,026 $113,964
990,989
kWh
$8,708
2,982
kW-months/year
$11,032
1,026
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas