IAC logo
IAC Assessment: MA0630
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0630
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Insulated copper wire and cable
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,369 1,429,800 kWh $0.10
Electricity Demand $20,698 4,486 kW-months/year $4.61
Other Gas $28,300 1,418 MMBtu $19.96
TOTAL ENERGY COSTS $227,029
RECOMMENDED SAVINGS* $55,097 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$29,594
Cost:
$49,500
$(-1,902) (-18,600) $(-166) (-36) $31,662 18,981,270 $(-1,902)
(-18,600)
kWh
$(-166)
(-36)
kW-months/year
$31,662
18,981,270
Tgal
02: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$22,703
Cost:
$72,000
$21,381 209,000 $1,322 287 - - $21,381
209,000
kWh
$1,322
287
kW-months/year
-
-
Tgal
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,565
Cost:
$2,000
$1,565 15,300 - - - - $1,565
15,300
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$639
Cost:
$300
$639 6,394 - - - - $639
6,394
kWh
-
-
kW-months/year
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$407
Cost:
$1,944
$407 4,066 - - - - $407
4,066
kWh
-
-
kW-months/year
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$189
Cost:
$1,300
$189 1,886 - - - - $189
1,886
kWh
-
-
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$55,097
Cost:
$127,044
$22,279 218,046 $1,156 251 $31,662 18,981,270 $22,279
218,046
kWh
$1,156
251
kW-months/year
$31,662
18,981,270
Tgal
TOTAL IMPLEMENTED Savings:
$2,393
Cost:
$3,600
$2,393 23,580 - - - - $2,393
23,580
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal