Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2008 |
Principal Product | Insulated copper wire and cable |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $10,000,000-$50,000,000 |
# of Employees | 72 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 100,000 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $146,369 | 1,429,800 | kWh | $0.10 |
Electricity Demand | $20,698 | 4,486 | kW-months/year | $4.61 |
Other Gas | $28,300 | 1,418 | MMBtu | $19.96 |
TOTAL ENERGY COSTS | $227,029 | |||
RECOMMENDED SAVINGS* | $55,097 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,393 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $29,594 Cost: $49,500 |
$(-1,902) | (-18,600) | $(-166) | (-36) | $31,662 | 18,981,270 |
$(-1,902) (-18,600) kWh |
$(-166) (-36) kW-months/year |
$31,662 18,981,270 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY |
Savings: $22,703 Cost: $72,000 |
$21,381 | 209,000 | $1,322 | 287 | - | - |
$21,381 209,000 kWh |
$1,322 287 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $1,565 Cost: $2,000 |
$1,565 | 15,300 | - | - | - | - |
$1,565 15,300 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $639 Cost: $300 |
$639 | 6,394 | - | - | - | - |
$639 6,394 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $407 Cost: $1,944 |
$407 | 4,066 | - | - | - | - |
$407 4,066 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $189 Cost: $1,300 |
$189 | 1,886 | - | - | - | - |
$189 1,886 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,097 Cost: $127,044 |
$22,279 | 218,046 | $1,156 | 251 | $31,662 | 18,981,270 | $22,279 218,046 kWh |
$1,156 251 kW-months/year |
$31,662 18,981,270 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,393 Cost: $3,600 |
$2,393 | 23,580 | - | - | - | - | $2,393 23,580 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal |