IAC logo
IAC Assessment: MA0633
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0633
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product coating for leather finishing
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 28
Plant Area (Sq.Ft.) 24,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 2,600
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,021 666,200 kWh $0.13
Electricity Demand $19,543 2,936 kW-months/year $6.66
Electricity Fees $192 - $ -
Natural Gas $59,993 4,363 MMBtu $13.75
Other Energy $74,100 71 MMBtu $1,043.66
TOTAL ENERGY COSTS $240,849
RECOMMENDED SAVINGS* $88,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Electricity Usage Electricity Demand Natural Gas Other Energy
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$76,628
Cost:
$85,000
$2,528 19,300 - - - - $74,100 71 $2,528
19,300
kWh
-
-
kW-months/year
-
-
MMBtu
$74,100
71
MMBtu
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$8,944
Cost:
$25,000
$5,554 42,400 $3,390 509 - - - - $5,554
42,400
kWh
$3,390
509
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$857
Cost:
$300
$733 5,600 - - $124 9 - - $733
5,600
kWh
-
-
kW-months/year
$124
9
MMBtu
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,171
Cost:
-
$2,171 16,575 - - - - - - $2,171
16,575
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$88,600
Cost:
$110,300
$10,986 83,875 $3,390 509 $124 9 $74,100 71 $10,986
83,875
kWh
$3,390
509
kW-months/year
$124
9
MMBtu
$74,100
71
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Other Energy Electricity Usage Electricity Demand Natural Gas Other Energy