IAC logo
IAC Assessment: MA0646
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0646
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2009
Principal Product Overhaul and repair of gas turbine fuel nozzles
NAICS 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
SIC 3511 - Turbines And Turbine Generator Sets
Sales $10,000,000-$50,000,000
# of Employees 84
Plant Area (Sq.Ft.) 43,000
Annual Production 26,258 Pieces
Production Hrs. Annual 4,160
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,651 879,753 kWh $0.14
Electricity Demand $48,593 2,275 kW-months/year $21.36
Electricity Fees $4,700 - $ -
Natural Gas $70,250 3,568 MMBtu $19.69
TOTAL ENERGY COSTS $246,194
RECOMMENDED SAVINGS* $17,864 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,288
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$7,158
Cost:
$8,683
$2,278 17,377 $4,880 248 $2,278
17,377
kWh
$4,880
248
MMBtu
02: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED Savings:
$5,780
Cost:
-
$5,780 44,460 - - $5,780
44,460
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,968
Cost:
$3,610
- - $1,968 100 -
-
kWh
$1,968
100
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,508
Cost:
$300
$1,508 11,607 - - $1,508
11,607
kWh
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,450
Cost:
$5,195
- - $1,450 74 -
-
kWh
$1,450
74
MMBtu
TOTAL RECOMMENDED Savings:
$17,864
Cost:
$17,788
$9,566 73,444 $8,298 422 $9,566
73,444
kWh
$8,298
422
MMBtu
TOTAL IMPLEMENTED Savings:
$7,288
Cost:
$300
$7,288 56,067 - - $7,288
56,067
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas