IAC logo
IAC Assessment: MA0653
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0653
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2009
Principal Product Coated and finished woven and non-woven materials
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 200,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 1,440
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,418 1,173,600 kWh $0.11
Electricity Demand $92,871 7,508 kW-months/year $12.37
Electricity Fees $8,608 - $ -
Natural Gas $347,467 25,094 MMBtu $13.85
TOTAL ENERGY COSTS $572,364
RECOMMENDED SAVINGS* $172,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,028
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$110,550
Cost:
$270,000
- - $110,550 8,250 -
-
kWh
$110,550
8,250
MMBtu
02: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$37,210
Cost:
$68,000
- - $37,210 2,777 -
-
kWh
$37,210
2,777
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$16,188
Cost:
$752
$2,453 23,365 $13,735 1,025 $2,453
23,365
kWh
$13,735
1,025
MMBtu
04: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$3,551
Cost:
$500
- - $3,551 265 -
-
kWh
$3,551
265
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,840
Cost:
$7,510
- - $2,840 212 -
-
kWh
$2,840
212
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,375
Cost:
$6,125
$2,375 22,622 - - $2,375
22,622
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$172,714
Cost:
$352,887
$4,828 45,987 $167,886 12,529 $4,828
45,987
kWh
$167,886
12,529
MMBtu
TOTAL IMPLEMENTED Savings:
$19,028
Cost:
$8,262
$2,453 23,365 $16,575 1,237 $2,453
23,365
kWh
$16,575
1,237
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas