IAC Assessment: MA0654
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0654
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2009
Principal Product Baked bread products
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 207
Plant Area (Sq.Ft.) 74,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $619,817 4,372,200 kWh $0.14
Electricity Demand $39,151 9,064 kW-months/year $4.32
Electricity Fees $876 - $ -
Natural Gas $527,976 44,735 MMBtu $11.80
TOTAL ENERGY COSTS $1,187,820
RECOMMENDED SAVINGS* $58,569 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,127
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$22,566
Cost:
$39,500
$(-145) (-1,099) - - $22,711 1,992 $(-145)
(-1,099)
kWh
-
-
kW-months/year
$22,711
1,992
MMBtu
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$15,750
Cost:
$30,000
$14,950 113,257 $800 182 - - $14,950
113,257
kWh
$800
182
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$10,377
Cost:
$18,330
$10,377 78,619 - - - - $10,377
78,619
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,876
Cost:
$9,840
- - - - $9,876 837 -
-
kWh
-
-
kW-months/year
$9,876
837
MMBtu
TOTAL RECOMMENDED Savings:
$58,569
Cost:
$97,670
$25,182 190,777 $800 182 $32,587 2,829 $25,182
190,777
kWh
$800
182
kW-months/year
$32,587
2,829
MMBtu
TOTAL IMPLEMENTED Savings:
$26,127
Cost:
$48,330
$25,327 191,876 $800 182 - - $25,327
191,876
kWh
$800
182
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas