IAC logo
IAC Assessment: MA0657
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0657
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2010
Principal Product Mattresses
NAICS 337910 - Mattress Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 130,000
Annual Production 6,600,000 Pounds
Production Hrs. Annual 2,080
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,278 899,400 kWh $0.13
Electricity Demand $17,599 4,282 kW-months/year $4.11
Electricity Fees $3,576 - $ -
Natural Gas $140,275 10,316 MMBtu $13.60
TOTAL ENERGY COSTS $281,728
RECOMMENDED SAVINGS* $23,515 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,257
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,606
Cost:
$38,400
- - - - $10,606 780 -
-
kWh
-
-
kW-months/year
$10,606
780
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,052
Cost:
$12,150
- - - - $4,052 297 -
-
kWh
-
-
kW-months/year
$4,052
297
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,527
Cost:
$4,840
$(-750) (-5,606) $(-27) (-7) $3,304 243 $(-750)
(-5,606)
kWh
$(-27)
(-7)
kW-months/year
$3,304
243
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,169
Cost:
-
- - - - $1,169 86 -
-
kWh
-
-
kW-months/year
$1,169
86
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,401
Cost:
$480
$1,401 10,479 - - - - $1,401
10,479
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,125
Cost:
$7,500
$2,125 15,897 - - - - $2,125
15,897
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,635
Cost:
$2,400
$1,635 12,227 - - - - $1,635
12,227
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,515
Cost:
$65,770
$4,411 32,997 $(-27) (-7) $19,131 1,406 $4,411
32,997
kWh
$(-27)
(-7)
kW-months/year
$19,131
1,406
MMBtu
TOTAL IMPLEMENTED Savings:
$8,257
Cost:
$15,030
$3,036 22,706 - - $5,221 383 $3,036
22,706
kWh
-
-
kW-months/year
$5,221
383
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas