IAC Assessment: MA0659
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0659
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2010
Principal Product Plastic moldings
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 53,000
Annual Production 120,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,238 2,175,360 kWh $0.10
Electricity Demand $34,442 6,026 kW-months/year $5.72
Electricity Fees $38,937 - $ -
Natural Gas $12,248 884 MMBtu $13.86
TOTAL ENERGY COSTS $294,865
RECOMMENDED SAVINGS* $110,381 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,952
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$35,538
Cost:
$103,290
$35,538 358,972 - - $35,538
358,972
kWh
-
-
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,141
Cost:
$119,100
$31,626 319,457 $3,515 614 $31,626
319,457
kWh
$3,515
614
kW-months/year
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$20,648
Cost:
$35,545
$20,648 208,648 - - $20,648
208,648
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,781
Cost:
$7,735
$16,781 169,504 - - $16,781
169,504
kWh
-
-
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,273
Cost:
$1,800
$2,273 22,958 - - $2,273
22,958
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$110,381
Cost:
$267,470
$106,866 1,079,539 $3,515 614 $106,866
1,079,539
kWh
$3,515
614
kW-months/year
TOTAL IMPLEMENTED Savings:
$72,952
Cost:
$224,190
$69,437 701,387 $3,515 614 $69,437
701,387
kWh
$3,515
614
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand