IAC logo
IAC Assessment: MA0664
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0664
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2010
Principal Product Cooked meat products
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 335
Plant Area (Sq.Ft.) 170,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $992,426 12,899,600 kWh $0.08
Electricity Demand $727,242 36,158 kW-months/year $20.11
Electricity Fees $(-46,019) - $ -
Natural Gas $971,815 106,492 MMBtu $9.13
TOTAL ENERGY COSTS $3,183,079
RECOMMENDED SAVINGS* $213,907 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,654
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$133,570
Cost:
$55,950
- - $133,570 6,641 - - -
-
kWh
$133,570
6,641
kW-months/year
-
-
Tgal
02: 3.4151 MINIMIZE WATER USAGE Savings:
$26,438
Cost:
$62,000
- - - - $26,438 44,928 -
-
kWh
-
-
kW-months/year
$26,438
44,928
Tgal
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$25,051
Cost:
$34,000
$25,051 325,764 - - - - $25,051
325,764
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$17,890
Cost:
$95,000
$17,890 232,650 - - - - $17,890
232,650
kWh
-
-
kW-months/year
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,874
Cost:
$18,345
$6,874 89,385 - - - - $6,874
89,385
kWh
-
-
kW-months/year
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,084
Cost:
$200
$4,084 53,112 - - - - $4,084
53,112
kWh
-
-
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$213,907
Cost:
$265,495
$53,899 700,911 $133,570 6,641 $26,438 44,928 $53,899
700,911
kWh
$133,570
6,641
kW-months/year
$26,438
44,928
Tgal
TOTAL IMPLEMENTED Savings:
$137,654
Cost:
$56,150
$4,084 53,112 $133,570 6,641 - - $4,084
53,112
kWh
$133,570
6,641
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal