IAC logo
IAC Assessment: MA0668
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0668
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Electrical Surface Mount Raceway
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 260,000
Annual Production 20,400,000 Pounds
Production Hrs. Annual 4,420
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $691,392 6,202,173 kWh $0.11
Electricity Demand $240,779 17,244 kW-months/year $13.96
Electricity Fees $11,400 - $ -
Natural Gas $247,015 22,491 MMBtu $10.98
TOTAL ENERGY COSTS $1,190,586
RECOMMENDED SAVINGS* $28,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,668
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,378
Cost:
$1,800
$8,378 75,140 - - $8,378
75,140
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$7,899
Cost:
$11,500
$7,899 70,854 - - $7,899
70,854
kWh
-
-
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,401
Cost:
$11,610
$3,401 30,503 - - $3,401
30,503
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,004
Cost:
$3,750
- - $3,004 296 -
-
kWh
$3,004
296
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,755
Cost:
$200
$2,755 24,711 - - $2,755
24,711
kWh
-
-
MMBtu
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,802
Cost:
$7,000
$1,802 16,157 - - $1,802
16,157
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$986
Cost:
$950
- - $986 97 -
-
kWh
$986
97
MMBtu
TOTAL RECOMMENDED Savings:
$28,225
Cost:
$36,810
$24,235 217,365 $3,990 393 $24,235
217,365
kWh
$3,990
393
MMBtu
TOTAL IMPLEMENTED Savings:
$23,668
Cost:
$29,610
$19,678 176,497 $3,990 393 $19,678
176,497
kWh
$3,990
393
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas