IAC logo
IAC Assessment: MA0669
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0669
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Processed fish and scallops
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $100,000,000-$500,000,000
# of Employees 238
Plant Area (Sq.Ft.) 130,000
Annual Production 49,000,000 Pounds
Production Hrs. Annual 5,880
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,460,023 9,465,120 kWh $0.15
Electricity Demand $249,063 26,825 kW-months/year $9.28
Electricity Fees $10,800 - $ -
Natural Gas $306,945 27,736 MMBtu $11.07
TOTAL ENERGY COSTS $2,026,831
RECOMMENDED SAVINGS* $63,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,211
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$28,774
Cost:
$63,300
- - - - $28,774 2,600 -
-
kWh
-
-
kW-months/year
$28,774
2,600
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,439
Cost:
$25,000
- - - - $12,439 1,124 -
-
kWh
-
-
kW-months/year
$12,439
1,124
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,179
Cost:
$11,190
- - $10,179 1,096 - - -
-
kWh
$10,179
1,096
kW-months/year
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,848
Cost:
$1,500
$7,848 50,960 - - - - $7,848
50,960
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,576
Cost:
$25,250
$3,576 23,220 - - - - $3,576
23,220
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$736
Cost:
$349
- - - - $736 67 -
-
kWh
-
-
kW-months/year
$736
67
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$410
Cost:
$550
- - - - $410 37 -
-
kWh
-
-
kW-months/year
$410
37
MMBtu
TOTAL RECOMMENDED Savings:
$63,962
Cost:
$127,139
$11,424 74,180 $10,179 1,096 $42,359 3,828 $11,424
74,180
kWh
$10,179
1,096
kW-months/year
$42,359
3,828
MMBtu
TOTAL IMPLEMENTED Savings:
$47,211
Cost:
$76,540
$7,848 50,960 $10,179 1,096 $29,184 2,637 $7,848
50,960
kWh
$10,179
1,096
kW-months/year
$29,184
2,637
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas