IAC logo
IAC Assessment: MA0673
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0673
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Chisels, bars and punches
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 21,000
Annual Production 1,500,000 Tons
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,719 1,059,136 kWh $0.09
Electricity Demand $35,353 3,378 kW-months/year $10.47
Electricity Fees $7,800 - $ -
LPG $151,478 6,981 MMBtu $21.70
TOTAL ENERGY COSTS $294,350
RECOMMENDED SAVINGS* $18,487 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,995
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,145
Cost:
$1,370
- - $4,145 191 -
-
kWh
$4,145
191
MMBtu
02: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$3,752
Cost:
$490
- - $3,752 173 -
-
kWh
$3,752
173
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,772
Cost:
$540
$3,772 40,127 - - $3,772
40,127
kWh
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,179
Cost:
$8,435
$3,179 33,818 - - $3,179
33,818
kWh
-
-
MMBtu
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,432
Cost:
$6,475
$1,432 15,237 - - $1,432
15,237
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,078
Cost:
$200
$1,078 11,473 - - $1,078
11,473
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$743
Cost:
$1,800
$743 7,094 - - $743
7,094
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$386
Cost:
$450
- - $386 18 -
-
kWh
$386
18
MMBtu
TOTAL RECOMMENDED Savings:
$18,487
Cost:
$19,760
$10,204 107,749 $8,283 382 $10,204
107,749
kWh
$8,283
382
MMBtu
TOTAL IMPLEMENTED Savings:
$8,995
Cost:
$2,110
$4,850 51,600 $4,145 191 $4,850
51,600
kWh
$4,145
191
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG