IAC logo
IAC Assessment: MA0674
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0674
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product cable manufacturing
NAICS 335921 - Fiber Optic Cable Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 180,000
Annual Production 40,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $415,944 3,834,000 kWh $0.11
Electricity Demand $29,772 7,595 kW-months/year $3.92
Electricity Fees $2,400 - $ -
Natural Gas $58,712 5,945 MMBtu $9.88
TOTAL ENERGY COSTS $506,828
RECOMMENDED SAVINGS* $25,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$11,498
Cost:
$17,900
$11,498 100,769 - - $11,498
100,769
kWh
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,531
Cost:
$19,965
$(-2,638) (-23,126) $9,169 892 $(-2,638)
(-23,126)
kWh
$9,169
892
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$2,652
Cost:
$1,200
- - $2,652 258 -
-
kWh
$2,652
258
MMBtu
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,323
Cost:
$14,500
- - $2,323 226 -
-
kWh
$2,323
226
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$941
Cost:
$6,225
$941 8,249 - - $941
8,249
kWh
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$670
Cost:
$2,150
$670 5,878 - - $670
5,878
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$434
Cost:
$1,400
- - $434 42 -
-
kWh
$434
42
MMBtu
TOTAL RECOMMENDED Savings:
$25,049
Cost:
$63,340
$10,471 91,770 $14,578 1,418 $10,471
91,770
kWh
$14,578
1,418
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas