IAC Assessment: MA0687
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0687
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Low pressure gast turbine and compressor air foils
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales >$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 125,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $588,414 8,097,772 kWh $0.07
Electricity Demand $271,971 16,324 kW-months/year $16.66
Electricity Fees $4,908 - $ -
LPG $62,256 3,262 MMBtu $19.09
Fuel Oil #2 $196,960 8,652 MMBtu $22.76
TOTAL ENERGY COSTS $1,124,508
RECOMMENDED SAVINGS* $87,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,646
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$50,722
Cost:
$198,500
$(-2,568) (-24,226) $53,290 2,341 $(-2,568)
(-24,226)
kWh
$53,290
2,341
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,773
Cost:
$12,025
$10,773 148,193 - - $10,773
148,193
kWh
-
-
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$10,724
Cost:
$45,500
$10,724 147,514 - - $10,724
147,514
kWh
-
-
MMBtu
04: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$5,375
Cost:
$1,000
$5,375 97,937 - - $5,375
97,937
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,857
Cost:
$9,000
$3,857 53,056 - - $3,857
53,056
kWh
-
-
MMBtu
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,065
Cost:
$11,500
$3,065 42,155 - - $3,065
42,155
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,306
Cost:
$4,500
$2,306 31,717 - - $2,306
31,717
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$637
Cost:
$1,250
- - $637 28 -
-
kWh
$637
28
MMBtu
TOTAL RECOMMENDED Savings:
$87,459
Cost:
$283,275
$33,532 496,346 $53,927 2,369 $33,532
496,346
kWh
$53,927
2,369
MMBtu
TOTAL IMPLEMENTED Savings:
$17,646
Cost:
$66,000
$17,646 242,725 - - $17,646
242,725
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2