IAC logo
IAC Assessment: MA0693
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0693
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Power supplies, AD converters and panel meters
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $50,000,000-$100,000,000
# of Employees 249
Plant Area (Sq.Ft.) 180,000
Annual Production 5,500,000 Pieces
Production Hrs. Annual 2,400
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $588,953 5,637,600 kWh $0.10
Electricity Demand $126,231 12,437 kW-months/year $10.15
Electricity Fees $240 - $ -
Natural Gas $23,893 4,292 MMBtu $5.57
TOTAL ENERGY COSTS $739,317
RECOMMENDED SAVINGS* $59,027 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,819
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$25,247
Cost:
$500
- - $25,247 - - - -
-
kWh
$25,247
-
$
-
-
MMBtu
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$15,776
Cost:
$43,000
$15,776 335,650 - - - - $15,776
335,650
kWh
-
-
$
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$9,000
Cost:
$4,200
$9,000 191,494 - - - - $9,000
191,494
kWh
-
-
$
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,573
Cost:
$27,000
$6,573 139,860 - - - - $6,573
139,860
kWh
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,572
Cost:
$4,200
$1,572 33,437 - - - - $1,572
33,437
kWh
-
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$486
Cost:
$200
$486 10,344 - - - - $486
10,344
kWh
-
-
$
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$373
Cost:
$600
- - - - $373 67 -
-
kWh
-
-
$
$373
67
MMBtu
TOTAL RECOMMENDED Savings:
$59,027
Cost:
$79,700
$33,407 710,785 $25,247 - $373 67 $33,407
710,785
kWh
$25,247
-
$
$373
67
MMBtu
TOTAL IMPLEMENTED Savings:
$35,819
Cost:
$8,900
$10,572 224,931 $25,247 - - - $10,572
224,931
kWh
$25,247
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas