Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2012 |
Principal Product | Foam molded packaging products |
NAICS | 326140 - Polystyrene Foam Product Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $5,000,000-$10,000,000 |
# of Employees | 31 |
Plant Area (Sq.Ft.) | 152,000 |
Annual Production | 1,500,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $187,929 | 1,937,970 | kWh | $0.10 |
Electricity Demand | $106,885 | 9,834 | kW-months/year | $10.87 |
Electricity Fees | $4,800 | - | $ | - |
Natural Gas | $238,714 | 35,937 | MMBtu | $6.64 |
TOTAL ENERGY COSTS | $538,328 | |||
RECOMMENDED SAVINGS* | $27,254 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,174 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $10,588 Cost: $9,425 |
- | - | $10,588 | 974 | - | - |
- - kWh |
$10,588 974 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,359 Cost: $5,625 |
$3,359 | 34,630 | - | - | - | - |
$3,359 34,630 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,287 Cost: $6,060 |
- | - | - | - | $3,287 | 495 |
- - kWh |
- - kW-months/year |
$3,287 495 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,220 Cost: $4,900 |
$3,220 | 33,202 | - | - | - | - |
$3,220 33,202 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $3,040 Cost: $2,080 |
$1,719 | 17,725 | - | - | $1,321 | 199 |
$1,719 17,725 kWh |
- - kW-months/year |
$1,321 199 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,371 Cost: $2,930 |
$1,371 | 14,140 | - | - | - | - |
$1,371 14,140 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,254 Cost: $100 |
$1,254 | 12,928 | - | - | - | - |
$1,254 12,928 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $803 Cost: $1,200 |
- | - | - | - | $803 | 121 |
- - kWh |
- - kW-months/year |
$803 121 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS |
Savings: $332 Cost: $150 |
- | - | - | - | $332 | 50 |
- - kWh |
- - kW-months/year |
$332 50 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,254 Cost: $32,470 |
$10,923 | 112,625 | $10,588 | 974 | $5,743 | 865 | $10,923 112,625 kWh |
$10,588 974 kW-months/year |
$5,743 865 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,174 Cost: $9,675 |
$1,254 | 12,928 | $10,588 | 974 | $332 | 50 | $1,254 12,928 kWh |
$10,588 974 kW-months/year |
$332 50 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |